Tender Details

Particulars Details
Title
Construction Of Ring Bundh At Various Canal During The Canal Closure Period For Rwss Sangaria
Description
Construction Of Ring Bundh At Various Canal During The Canal Closure Period For Rwss Sangaria
Organisation PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT
Tender Id 2024_PHCJA_381817_1
Reference
Number
EE/PHED/HMH/83/2023-24
Tender Fee 1000
EMD 8000
Tender Value -
Place AEN PHED Sub Dn Sangaria
Link
View Original Tender Notice

https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=680033

Start Date February 17, 2024 23:30
End Date
Expired 26/02/2024

Expired 958 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27

Read more
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Read more
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Construction fo ring bundh at various canal during the canal closure period for rwss sangaria

Construction fo ring bundh at various canal during the canal closure period for rwss sangaria

Read more
Construction of ring bundh at sadul branch canal during the canal closure period for uwss sangaria

Construction of ring bundh at sadul branch canal during the canal closure period for uwss sangaria

Read more
Construction fo ring bundh at various canal during the canal closure period for rwss tibbi

Construction fo ring bundh at various canal during the canal closure period for rwss tibbi

Read more
Construction of ring bundh at various canal during the canal closure period for rwss tibbi

Construction of ring bundh at various canal during the canal closure period for rwss tibbi

Read more
Construction fo ring bundh at various canal during the canal closure period for rwss hanumangarh jn.

Construction fo ring bundh at various canal during the canal closure period for rwss hanumangarh jn.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise