Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Ring Bundh At Various Canal During The Canal Closure Period For Rwss Sangaria
|
| Description |
Construction Of Ring Bundh At Various Canal During The Canal Closure Period For Rwss Sangaria
|
| Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
| Tender Id | 2024_PHCJA_381817_1 |
|
Reference Number |
EE/PHED/HMH/83/2023-24 |
| Tender Fee | 1000 |
| EMD | 8000 |
| Tender Value | - |
| Place | AEN PHED Sub Dn Sangaria |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=680033 |
| Start Date | February 17, 2024 23:30 |
| End Date |
Expired
26/02/2024
Expired 958 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Maintenance of parks and gardens in rg.ii area for a period of one year during 2026 27
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreConstruction fo ring bundh at various canal during the canal closure period for rwss sangaria
Construction fo ring bundh at various canal during the canal closure period for rwss sangaria
Read moreConstruction of ring bundh at sadul branch canal during the canal closure period for uwss sangaria
Construction of ring bundh at sadul branch canal during the canal closure period for uwss sangaria
Read moreConstruction fo ring bundh at various canal during the canal closure period for rwss tibbi
Construction fo ring bundh at various canal during the canal closure period for rwss tibbi
Read moreConstruction of ring bundh at various canal during the canal closure period for rwss tibbi
Construction of ring bundh at various canal during the canal closure period for rwss tibbi
Read moreConstruction fo ring bundh at various canal during the canal closure period for rwss hanumangarh jn.
Construction fo ring bundh at various canal during the canal closure period for rwss hanumangarh jn.
Read moreof your Industry type