Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hydraulic Track Lifting Cum Slewing Device (Tralis) 15 Ton Capacity As Per Rdso Specification No.Tm/Sm/Tralis/220 Dated.24.09.2004 (Revision 02 Of 2022) Or Latest If Any.
|
| Description |
Hydraulic Track Lifting Cum Slewing Device (Tralis) 15 Ton Capacity As Per Rdso Specification No.Tm/Sm/Tralis/220 Dated.24.09.2004 (Revision 02 Of 2022) Or Latest If Any.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | September 22, 2026 23:26 |
| End Date |
Open
19/10/2026
4 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rail drilling machine as per rdso specification (no.tm/sm/3dt. 19.11.1992) first revision, 2020 or latest if any
Rail drilling machine as per rdso specification (no.tm/sm/3dt. 19.11.1992) first revision, 2020 or latest if any
Read moreRail drilling machine as per rdso specification no.tm/sm/3, dt: 19.11.1992 latest revision 01 dt.17/12/2020 or latest if any.
Rail drilling machine as per rdso specification no.tm/sm/3, dt: 19.11.1992 latest revision 01 dt.17/12/2020 or latest if any.
Read moreAbrasive rail cutter as per rdso specification no.-tm/sm/1 (second revision) 2020 or latest if any
Abrasive rail cutter as per rdso specification no.-tm/sm/1 (second revision) 2020 or latest if any
Read moreAbrasive rail cutter as per rdso specification no.: tm/sm/1(second revision) 2020, dt: 07.12.2020 or latest if any.
Abrasive rail cutter as per rdso specification no.: tm/sm/1(second revision) 2020, dt: 07.12.2020 or latest if any.
Read moreWeld trimmer power pack version for a.t welding as per rdso specification no. tm/sm/9 dt. 16.08.1991 second revision 2022 or latest if any
Weld trimmer power pack version for a.t welding as per rdso specification no. tm/sm/9 dt. 16.08.1991 second revision 2022 or latest if any
Read morePirce agreement for manufactruing and supply of metal liner 60 kg for use with wider base sleepers with 60 kg (uic) or 136 re rails to rdso drg. no. t8748 (alt-1) with latest alterations, if any, conforming to irs specification: t-56- 2025 (revision 1) with latest amendment, if any as on date of opening of tender.
Pirce agreement for manufactruing and supply of metal liner 60 kg for use with wider base sleepers with 60 kg (uic) or 136 re rails to rdso drg. no. t8748 (alt-1) with latest alterations, if any, conforming to irs specification: t-56- 2025 (revision 1) with latest amendment, if any as on date of opening of tender.
Read morePrice agreement for manufacture and supply of metal liner for use with erc mk.-iii flat toe on concrete sleeper for 60 kg rail to rdso drg. no.t-3740 to alteration-7 with latest alteration if any, conforming to irs specification:t-56- 2025 (revision 1) with latest amendment, if any as on date of opening of tender.
Price agreement for manufacture and supply of metal liner for use with erc mk.-iii flat toe on concrete sleeper for 60 kg rail to rdso drg. no.t-3740 to alteration-7 with latest alteration if any, conforming to irs specification:t-56- 2025 (revision 1) with latest amendment, if any as on date of opening of tender.
Read more18 months rate contract for supply of elastic rail clip(erc) mk-v with flat toe for 60kg uic/52kg rail sections drg: (rdso) rdso_t_5919_ alt_2 spec: (rdso) irs/t-31-2025 sixth revision (or latest alteration, if any).
18 months rate contract for supply of elastic rail clip(erc) mk-v with flat toe for 60kg uic/52kg rail sections drg: (rdso) rdso_t_5919_ alt_2 spec: (rdso) irs/t-31-2025 sixth revision (or latest alteration, if any).
Read moreTrough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Trough floor assembly complete for 3 phase memu/dmc coach note:- 1.0 extra channels are to be provided on suitable location of trough floor assembly for lifting/transporation purpose ., as per drawing: em11545 alt b item no. 6 to be supplied as loose in seprate packing, packing instruction: no special packing required. the protruding, threaded portion, gauges and loose items etc. if any are to be protected with suitable covering to prevent it from damage. however transit damage if any sh
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreof your Industry type