Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit Ii Overhauling Of Steam And Condensate Valves Of Turbine Regeneration System During Annual Overhaul 2024 2025
|
Description |
Ttps Mech Ii Tm I Unit Ii Overhauling Of Steam And Condensate Valves Of Turbine Regeneration System During Annual Overhaul 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_452900_1 |
Reference Number |
CE/TTPS/SE/M-II/No.152/2024-25 |
Tender Fee | 0 |
EMD | 7600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539079 |
Start Date | June 08, 2024 00:25 |
End Date |
13/06/2024 ( Expired 387 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Provision of deficient fire main system to store house ac-i ac-ii ac-iii r d sh mech sh p-38 building and pol store at weapon equipment depot under ge u-ii, visakhapatnam
Read moreProcurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Procurement of spares of oil supply unit installed at hpbp system of 2x210 mw and 2x250 mw units of stage-i and ii at ghtp, lehra mohabbat
Read moreSupply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Supply, installation and commissioning work of complete restoration of auto control system, alarm system and interlock protection of emulsifier system for gt, st, uat and mot rooms for unit no. i,ii,iii and iv at sgtps, mppgcl, birsinghpur.
Read moreTtps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2025 26
Ttps mech ii tm i unit iii inspection painting overhauling of condenser cw pipelines hotwells etc during annual overhaul 2025 26
Read moreTtps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Ttps mech ii tm i unit iii removal of deteriorated cladding over the surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of mat
Read moreTtps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26
Ttps mech ii tm i unit iii overhauling of feed water tank deaerator vent condenser and overhauling of feed water valves steam condensate valves during annual overhaul 2025 26
Read moreTtps es circle mrt i unit iii annual overhauling of turbine side valve actuator electrical portion limit switch torque switch assemblies for the year 2025 26
Ttps es circle mrt i unit iii annual overhauling of turbine side valve actuator electrical portion limit switch torque switch assemblies for the year 2025 26
Read moreTtps es circle instn i overhauling of servo valves for hp lp bypass system during unit overhaul period 2025 2026 in unit iii
Ttps es circle instn i overhauling of servo valves for hp lp bypass system during unit overhaul period 2025 2026 in unit iii
Read moreTtps es circle em ii annual maintenance of lt switchgear lt breakers modules bus bars and isolators during the overhaul period of 25 26 at ahp stage ii
Ttps es circle em ii annual maintenance of lt switchgear lt breakers modules bus bars and isolators during the overhaul period of 25 26 at ahp stage ii
Read moreTtps es circle em i retrofitting of 3 nos lt acb edo 3 pole 3200 amps breakers with retrofit kit for replacement of the existing breakers in unit i ii and iii 6 6kv control room
Ttps es circle em i retrofitting of 3 nos lt acb edo 3 pole 3200 amps breakers with retrofit kit for replacement of the existing breakers in unit i ii and iii 6 6kv control room
Read moreof your Industry type