Tender Details
Particulars | Details |
---|---|
Title |
Wbpwd/Ae/Bkpsd I/N Ie T17/23 24
|
Description |
Special Repairing Works By Providing Steel Window Repairing, Glass Panes, Expansion Joint Repairing And Rain Water Pipe At Bhatpara State General Hospital Under Pwd, Barrackpore Division During 2023 24
|
Organisation | Government of West Bengal |
Tender Id | 2023_WBPWD_556151_1 |
Reference Number |
WBPWD/AE/BKPSD-I/NIeT17/23-24 |
Tender Fee | |
EMD | 9003 |
Tender Value | |
Place | BARRACKPORE |
Link | https://wbtenders.gov.in |
Start Date | August 10, 2023 20:30 |
End Date |
21/08/2023 ( Expired 628 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance of pipeline by repairing of leakage, washing of existing pipeline in/c all other allied works in different water supply schemes under hrishyamukh rd block under dws sub-division, belonia during the year 2025-26.
Maintenance of pipeline by repairing of leakage, washing of existing pipeline in/c all other allied works in different water supply schemes under hrishyamukh rd block under dws sub-division, belonia during the year 2025-26.
Read moreMaintenance of pipeline by repairing of leakage, washing of existing pipeline in/c all other allied works in different water supply schemes under jolaibari rd block under dws sub-division, jolaibari during the year 2025-26.
Maintenance of pipeline by repairing of leakage, washing of existing pipeline in/c all other allied works in different water supply schemes under jolaibari rd block under dws sub-division, jolaibari during the year 2025-26.
Read moreProviding and laying m.s. pipe for di of storm water from jln marg to drain at asaf ali road under srd-1/sub division-ii, pwd new delhi during 2025-26.
Providing and laying m.s. pipe for di of storm water from jln marg to drain at asaf ali road under srd-1/sub division-ii, pwd new delhi during 2025-26.
Read more24-proposal for improvement of water supply existing system, by replacement of moter pump sets, lowering pipe , starters, dismantling joint and submersible cable in sub division city dholpur under division dholpur, distt. collector emergent works
24-proposal for improvement of water supply existing system, by replacement of moter pump sets, lowering pipe , starters, dismantling joint and submersible cable in sub division city dholpur under division dholpur, distt. collector emergent works
Read moreWbpwd/rd/ae/phsd/nit07/24-25/1
Prajabar arankiarana from ch. 9.70 km to 10.70 km, temporary patch repairing works by repairing potholes, 20 mm pc and sc in stretches under panskura highway sub division withintamluk highway division in the district of purba medinipur during the yea
Read moreRepair and maintenance of infrastructure assets in r-ii division during 2023-24. sh - providing and laying 450mm dia np2 rcc pipe drainage system near georgia embassy, jor bagh area under sub division-iii (r-ii division).
Repair and maintenance of infrastructure assets in r-ii division during 2023-24. sh - providing and laying 450mm dia np2 rcc pipe drainage system near georgia embassy, jor bagh area under sub division-iii (r-ii division).
Read moreSpecial repairing and painting works to the external surface of the kandi sd hospital in the murshidabad district under berhampore division no-1 , pwd during the year 2024-25.
Special repairing and painting works to the external surface of the kandi sd hospital in the murshidabad district under berhampore division no-1 , pwd during the year 2024-25.
Read moreA/r and m/o to various roads under sub-division east road-iv of pwd division east roads/(m-212), delhi during 2024-25. (sh- providing and fixing missing g.i pipe railing over crash barriers of flyovers at nh-24, mayur vihar ph-i, mayur vihar extensio
A/r and m/o to various roads under sub-division east road-iv of pwd division east roads/(m-212), delhi during 2024-25. (sh- providing and fixing missing g.i pipe railing over crash barriers of flyovers at nh-24, mayur vihar ph-i, mayur vihar extensio
Read moreConstruction of 50 cum capacity underground reservoir for fire fighting arrangement at chanchal sub-divisional hospital at chanchal under malda division, pwd, during the year 2023-24.
Construction of 50 cum capacity underground reservoir for fire fighting arrangement at chanchal sub-divisional hospital at chanchal under malda division, pwd, during the year 2023-24.
Read more111 anti erosion works and 01 rain water harvesting (rwh) scheme_protection of nabinagar khowaria li scheme from the erosion of bijoy river under wr sub-division, bishalgarh during the year 2023-24
111 anti erosion works and 01 rain water harvesting (rwh) scheme_protection of nabinagar khowaria li scheme from the erosion of bijoy river under wr sub-division, bishalgarh during the year 2023-24
Read moreof your Industry type