Tender Details
Particulars | Details |
---|---|
Title |
Servicing And Maintenance Of Saunders Valves Actuators Of Water Treatment Plant At Heavy Water Plant Kota During Major Turn Around 2025
|
Description |
Servicing And Maintenance Of Saunders Valves Actuators Of Water Treatment Plant At Heavy Water Plant Kota During Major Turn Around 2025
|
Organisation | Heavy Water Board | Central Govt. Ministry/Department |
Tender Id | 2025_HWB_849098_1 |
Reference Number |
HWPK/INST/2024/SV-MTA25/312 |
Tender Fee | 0 |
EMD | 19729 |
Tender Value | |
Place | HWPK PLANT SITE |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=892580 |
Start Date | February 25, 2025 15:30 |
End Date |
19/03/2025 ( Expired 83 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Supply, installation, commissioning and maintenance of frp made 10 seater yatch alongwith flybridge powerd with yamaha or suzuki or tohatsu or honda obm at dumboor lake, tripura alongwith amc during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreProviding, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Providing, erection testing and fixing of online continuous monitoring system as per ngt and ppcb guide lines at sewerage treatment plant.
Read moreRenewal of corroded interconnecting channel segment and main beam patch-up beneath the nozzle floor of urea prill tower in urea plant during tar 2025
Renewal of corroded interconnecting channel segment and main beam patch-up beneath the nozzle floor of urea prill tower in urea plant during tar 2025
Read moreJp/b862-204-pd-t-8701/1016 - water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Water block package (rwtp, rodmp, cpu and etp) for pdh pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreHouse keeping, catering service, lawn maintenance and civil maintenance of erector hostel building at 400 kv s/s orai distt. jalaun. (p.r. no. 1300065071/2025)
House keeping, catering service, lawn maintenance and civil maintenance of erector hostel building at 400 kv s/s orai distt. jalaun. (p.r. no. 1300065071/2025)
Read moreCleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Cleaning of spilled iron ore in and around the loading line conveyors namely conv 403, conv 404, tripper 405, vibratory feeder 406/a to f, conv 407/a to f and conv 408/a to f of loading plant for a period of 10 months in fy 2025-26
Read moreCleaning of spilled iron ore in and around loading plant conveyors and surrounding areas during monsoon period at loading plant, biom, kirandul complex
Cleaning of spilled iron ore in and around loading plant conveyors and surrounding areas during monsoon period at loading plant, biom, kirandul complex
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreof your Industry type