Tender Details

Particulars Details
Title
Sditc Of 2 Sets Of 50 Hp Vertical Turbine Pump Along With Suitable Induction Motor With A Defect Liability Period Of 2 Years And Non Comprehensive Maintenance Contract For 5years(for New Pump 3 Years After Dlp) For 2 Nos. New Installed Pumps Of Hdc
Description
Sditc Of 2 Sets Of 50 Hp Vertical Turbine Pump Along With Suitable Induction Motor With A Defect Liability Period Of 2 Years And Non Comprehensive Maintenance Contract For 5years(for New Pump 3 Years After Dlp) For 2 Nos. New Installed Pumps Of Hdc
Organisation Kolkata Port Trust | Central Govt. Ministry/Department
Tender Id 2024_KoPT_833137_1
Reference
Number
SDM-PE/T/16/2024-2025
Tender Fee 1770
EMD 1.04 Lakh
Tender Value
Place Haldia
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=875558
Start Date November 07, 2024 21:30
End Date

20/11/2024 ( Expired 222 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of 350hp submersible pump set complete along with cmc for 5 years after warranty.

Procurement of 350hp submersible pump complete along with cmc for 5 years after warranty.

Read more
Annual rate contract for work of construction and commissioning of 200 mm dia tube well including allied works with 2 years of defect liability under jurisdiction of city dn-iii(n) jaipur

Annual rate contract for work of construction and commissioning of 200 mm dia tube well including allied works with 2 years of defect liability under jurisdiction of city dn-iii(n) jaipur

Read more
Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.

Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.

Read more
Providing and fixing standby motors/ new panel/ starter/ wire/ m.c.b/ etc required at the boosting station/ tubewells in ward no. 4 division 3a zone 3 with defect liability period for 2 years

Providing and fixing standby motors/ new panel/ starter/ wire/ m.c.b/ etc required at the boosting station/ tubewells in ward no. 4 division 3a zone 3 with defect liability period for 2 years

Read more
Repair of crompton make15 hp 3 phase low speed induction motor of vacuum pump s.no 01 installed at old gas plant room of gmch, jammu along with allied works

Repair of crompton make15 hp 3 phase low speed induction motor of vacuum pump s.no 01 installed at old gas plant room of gmch, jammu along with allied works

Read more
Replacement of old 20 sqmm acsr with 30 sqmm pvc insulated acsr of street light phase in existing lt lines and providing 2 nos.street light pedestals in sector-33 at hisar. including 3 years defect liability period for all other items free of cost.

Replacement of old 20 sqmm acsr with 30 sqmm pvc insulated acsr of street light phase in existing lt lines and providing 2 nos.street light pedestals in sector-33 at hisar. including 3 years defect liability period for all other items free of cost.

Read more
Construction and commissioning of 07 nos 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 02 years at various rwss/uwss of division neem ka thana

Construction and commissioning of 07 nos 200 mm dia tube wells with submersible pump sets etc. complete work in all types of strata including defect liability period of 02 years at various rwss/uwss of division neem ka thana

Read more
State plan 2023 24 tss supply erection trial and commissioning of non clog dry installed flood proof submersible pump suitable for pumping raw sewage with all accessories at plamoodu pump house

State plan 2023 24 tss supply erection trial and commissioning of non clog dry installed flood proof submersible pump suitable for pumping raw sewage with all accessories at plamoodu pump house

Read more
Chhatter - supply, erection and commissioning of v.t. pumps of 05 cs. discharge capacity along with shaft motor of 30 hp fully transformer type er suitable for 30 hp motor alongwith 03 nos. air break contractor 50 amp, 40 amp, 30 amp and mccb 10

Chhatter - supply, erection and commissioning of v.t. pumps of 05 cs. discharge capacity along with shaft motor of 30 hp fully transformer type er suitable for 30 hp motor alongwith 03 nos. air break contractor 50 amp, 40 amp, 30 amp and mccb 10

Read more
Replacement of 4x40 kva online ups along with battery bank including annual comprehensive maintenance of ups for 5 years after dlp at tirupati airport

Replacement of 4x40 kva online ups along with battery bank including annual comprehensive maintenance of ups for 5 years after dlp at tirupati airport

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise