Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Earth Work Excavation By Manual Meansover Area Exceeding 30cm In Depth Or 10 Sqm On Plan,Providing
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2023/B/4103048 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://gem.gov.in/ |
Start Date | November 01, 2023 02:46 |
End Date |
11/11/2023 ( Expired 595 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2, plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category 2nd call
Allotment of land on long term lease of 10 years on as is where is basis in zone z- 2, plot 108 m2 0.03 acres in modern fish market area at fishing harbour area for installation of signal tower under commercial category 2nd call
Read moreProtection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Protection work of yamuna bridge of span 437.50 m at km. 13-14 on nh 123(507) under annual plan 2025-26 in the state of uttarakhand under epc mode
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreAddn/altn of roof treatment and connected b/r wks in certain jco/or md accn in vasant range colony and certain minor work under age b/r-i of ge (south) delhi cantt-10
Addn/altn of roof treatment and connected b/r wks in certain jco/or md accn in vasant range colony and certain minor work under age b/r-i of ge (south) delhi cantt-10
Read morePme work and grass cutting work on southern runway in tech area af stn gwalior
Pme work and grass cutting work on southern runway in tech area af stn gwalior
Read moreSpecial repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
.special repair by providing strengthening of road from sirsa-jamal- nithrana upto rajsthan border road km 0.00 to 29.68 (road id5828 and 5829 ) in sirsa district in sirsa and ellenabad constituency (work programme 2025-26) under head-5054 (group-ii)
Read moreWidening work of mill area police chowki on tulsidas marg via bala ji temple to hardoi railway crossing vikram cotton mill bridge in lucknow district - 1.200 km
Widening work of mill area police chowki on tulsidas marg via bala ji temple to hardoi railway crossing vikram cotton mill bridge in lucknow district - 1.200 km
Read moreBtps-tggenco
Btps - chp - removal of spilled over coal, fine dust and wet coal at bcn-3ab tunnel, fg floor at tp-2, ground portal, gallery and head end areas and contingency-1 and 2 area of 3ab including fg floors and reclaim belt conveyors and reclaim chain feeders by head loads on to running conveyor required in mm/chp/btps from 01.08.2025 or actual date of commencement of work to 30.11.2025.
Read moreConstruction work of cc tiles, side track and drain and cc road on both sides from the house of ajay kashyap to the house of ashok kumar saxena via gulshan kumar in ward-10 shyam enclave, veer savarkar nagar.
Construction work of cc tiles, side track and drain and cc road on both sides from the house of ajay kashyap to the house of ashok kumar saxena via gulshan kumar in ward-10 shyam enclave, veer savarkar nagar.
Read moreof your Industry type