Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Compound Wall To Sri Veerabrahmendra Shaivagama Vedapatasala, Kandimallaiahpalli (V), B.Mattam(m), Kadapa District
|
| Description |
Construction Of Compound Wall To Sri Veerabrahmendra Shaivagama Vedapatasala, Kandimallaiahpalli (V), B.Mattam(m), Kadapa District
|
| Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
| Tender Id | 835981 |
|
Reference Number |
P/COE/813/2025-35 |
| Tender Fee | 701 |
| EMD | 19792 |
| Tender Value | |
| Place | AP |
| Link |
View Original Tender Notice
https://tender.apeprocurement.gov.in |
| Start Date | August 07, 2025 16:00 |
| End Date |
Expired
21/08/2025
Expired 334 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreTender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam
Read moreLicense right for collection of human hair at sri madvirat pothuluri veerabrahmendra swamy temple, kandimallayyapalli(v),b.mattam(m), kadapa district for the period from 01-06-2026 to 31-05-2027
License right for collection of human hair at sri madvirat pothuluri veerabrahmendra swamy temple, kandimallayyapalli(v),b.mattam(m), kadapa district for the period from 01-06-2026 to 31-05-2027
Read moreConstruction of compound wall at north side to sri bhemeswara swamy temple, kamunaru(v), proddutur(m), kadapa district
Construction of compound wall at north side to sri bhemeswara swamy temple, kamunaru(v), proddutur(m), kadapa district
Read moreof your Industry type