Tender Details

About Tender

📍 Rfp: Centralized Gis Data Centre And Gis Lab Setup For Ayodhya Development Authority (Ada) 🗺️💻 The Ayodhya Faizabad Development Authority (Ada) Invites Proposals Through A Request For Proposal (Rfp) Process For The Setting Up Of A Centralized Gis Data Centre And The Establishment Of A Gis Laboratory, Including Operation And Maintenance Services For A Period Of 5 Years. 📅 Proposal Submission Deadline: May 30, 2024, 3:30 Pm 💸 Tender Fee: Inr 35,000 Earnest Money Deposit (Emd): Inr 22,00,000 The Project Will Be Located In Ayodhya And Is Aimed At Enhancing The Spatial Planning And Management Capabilities Of The Ada. Interested Bidders Must Possess The Requisite Technical Expertise And Experience In Gis Technology And Infrastructure Development. Keywords: Rfp, Gis Data Centre, Gis Laboratory, Ayodhya Development Authority, Ada, Geographic Information Systems, Operation And Maintenance, State Govt. And Ut, Spatial Planning, Infrastructure Development
Particulars Details
Title
Request For Proposal (Rfp) For Setting Up Centralized Gis Data Centre And Establishment Of Gis Lab With Operation And Maintenance For 5 Years For Ayodhya Development Authority (Ada)
Description
Request For Proposal (Rfp) For Setting Up Centralized Gis Data Centre And Establishment Of Gis Lab With Operation And Maintenance For 5 Years For Ayodhya Development Authority (Ada)
Organisation Ayodhya Faizabad Development Authority | State Govt. and UT
Tender Id 2024_AFDA_896101_1
Reference
Number
ADA 859 Establishment of GIS Lab DT 13-02-2024
Tender Fee 35000
EMD 22 Lakh
Tender Value
Place AYODHYA
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1540658
Start Date February 13, 2024 23:30
End Date

30/05/2024 ( Expired 360 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic

Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&amp#x0d compatibility (emc) testing facility in&amp#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&amp#x0d

Read more
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Read more
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.

Read more
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode

Read more
Development, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)

Development, operation and maintenance of wayside amenities on lease basis (5 o-m sites) (nh-752d/ ujjain-badnawar/29-050/ lhs/pipliyragho/mp)

Read more
Asmapping of ehv transmission line towers using high resolution stereo satellite imageries and creation of web enabled gis based software application of ehv lines/towers with amc period of 5 years

Asmapping of ehv transmission line towers using high resolution stereo satellite imageries and creation of web enabled gis based software application of ehv lines/towers with amc period of 5 years

Read more
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up

Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh

Read more
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications

Read more
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise