Tender Details
Particulars | Details |
---|---|
Title |
Electrical Works For The Submersible Motors Installed In The Hostel Zone
|
Description |
Electrical Works For The Submersible Motors Installed In The Hostel Zone
|
Organisation | National Institute of Technology Tiruchirappalli | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 11347 |
Tender Value | |
Place | NIT,TIRUCHIRAPPALLI |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 23:30 |
End Date |
02/06/2025 ( 22 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreCompletion of incomplete works for provision of 36 permanent living in officers accn at afs carnicobar
Completion of incomplete works for provision of 36 permanent living in officers accn at afs carnicobar
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreEmpanelment of contractors for civil and electrical works at iit dharwad
Empanelment of contractors for civil and electrical works at iit dharwad
Read moreImplementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Read moreRepirs to sunken floor, vertical stacks, sanitary fittings and connected works at b, c jcos and ors type qtrs in zone a area at drdo township kanchanbagh under age b/r-i, hyderabad
Repirs to sunken floor, vertical stacks, sanitary fittings and connected works at b, c jcos and ors type qtrs in zone a area at drdo township kanchanbagh under age b/r-i, hyderabad
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreSurvey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Survey, investigation and execution for de-silting and associated works of existing storm water drainage pipeline in varanasi city, u.p. under deposit program (pkg-1)
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreof your Industry type