Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 19.75 Mtrs Span Rcc Box Girder Bridge Over Lal Ghar Nallah At Rd 3/450 And 40.00 Mtrs. Span Bridge Over Manjhi Khad At Rd 5/035 On Samber Lahar To Thathri Road Km 0/000 To 6/082 Under Pmgsy Iii
|
Description |
Package No. Hp 04 441 Missing Bridge In Distt. Kangra H.P Sh Geo Technical Investigation
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_104130_14 |
Reference Number |
231-65 |
Tender Fee | 350 |
EMD | 7900 |
Tender Value | |
Place | Dharamshala |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=152733 |
Start Date | April 21, 2025 21:30 |
End Date |
26/04/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 110 mtr span double lane motorable bridge over river beas at pandoh on pandoh nagdhar road at rd 0/150 (under pmgsy-iii, batch-i) (package no. hp-08-570).
Construction of 110 mtr span double lane
 motorable bridge over river beas at pandoh on pandoh
 nagdhar road at rd 0/150 (under pmgsy-iii, batch-i)
 (package no. hp-08-570).
Read moreConstruction of 40.00 metre span psc box girder missing bridge over moul khad at rd 3/890 on gallu bhoda to shivnagar road km 0/000 to 12/025 in district kangra (hp) (package no hp-04-444a) under pmgsy-iii (batch-i, 2024-25) in distt kangra (h.p.)
Construction of 40.00 metre span psc box girder bridge including both side approaches.
Read moreConstruction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.6m each eff. over lisara drain x-ing balianwali to lehra mohabat road at rd 1300 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Construction of high level bridge skew 3 span 13.0m each eff. over lisara drain x-ing bbm road to rampura pitho chowke at rd 6700 including its approaches,road di,dismantling and 2.5m high rcc retaining wall under pmgsy-iii(batch-1)
Read moreConstruction of 122.511 m long span bridge over bakkar khad at rd - 7/350 on barara to bakkar khad road via patnaun from km 0/000 to km 7/875 under pmgsy-iii
Geo-tech investigation
Read moreConstruction of 28.00 mtrs. single span steel truss bridge (through type) over sainj khad at 9/230 on sainj neuli kartah road under pmgsy-iii (batch-i) package no.hp-06-162 a.
Construction of 28.00 mtrs. single span steel truss bridge (through type) over sainj khad at 9/230 on sainj neuli kartah road under pmgsy-iii (batch-i) package no.hp-06-162 a.
Read moreC/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
C/o 76.00 meter single span steel truss (through type) bridge over tailing nallah at km. 2/900 on up-gradation of main road to ratil from km. 0/000 to 9/330 under pmgsy-iii batch-i package no.hp-07-161 a.
Read moreConstruction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h - construction of 19.75 metre span rcc t-beam bridge including both side approaches
Construction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h- construction of 19.75 metre span rcc t-beam bridge including both side approaches
Read moreConstruction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Construction and metalling tarring mata chintpurni to amlehar road from km 000 to 9350 sh construction of 14 40 mtr span cc rcc solid slab bridge over dhalwari khad at rd 4 155
Read moreConstruction of 19.75 mtrs span rcc box girder bridge over lal ghar nallah at rd 3/450 and 40.00 mtrs. span bridge over manjhi khad at rd 5/035 on samber lahar to thathri road km 0/000 to 6/082 under pmgsy -iii
Package no. hp-04-441 missing bridge in distt. kangra h.p sh-geo technical investigation
Read moreof your Industry type