Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Providing, Laying And Jointing Hdpe Pipe Line For Village 23 Mod Ii Under Sub Dn. Pilibangan (Emergent Work)
|
Description |
Providing, Laying And Jointing Hdpe Pipe Line For Village 23 Mod Ii Under Sub Dn. Pilibangan (Emergent Work)
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2025_PHCJA_461029_2 |
Reference Number |
EE/PHED/HMH/2025-26/06-08 |
Tender Fee | 1500 |
EMD | 25880 |
Tender Value | |
Place | Aen PHED Sub dn. Pilibangan |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=827334 |
Start Date | April 22, 2025 23:30 |
End Date |
28/04/2025 ( Expired 69 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreCivil maintenance contract for r and r sites, mmrcl transit office and civil and electrical work at mmrcl hallmark business plaza 2nd and 8th floor offices and other allied works under mumbai metro line iii of mmrcl.
Civil maintenance contract for r and r sites,
 mmrcl transit office and civil and electrical work
 at mmrcl hallmark business plaza 2nd and 8th
 floor offices and other allied works under mumbai
 metro line iii of mmrcl.
Read moreProviding, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule)
Providing, laying, jointing, testing and commissioning of 100 mm dia m.s. pipeline and construction of sumpwell all allied civil work at ashapura gram mhow (as per schedule) &#x0d &#x0d
Read moreProviding laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Providing laying and jointing of trunk main lines along with manholes part 1 for sewerage work in bambala area sanganer under ee phe i jda jaipur
Read moreRenovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of ramgarh sub-station (phase- ii) and west bokaro receiving sub-station under gomd-vii, dvc, ramgarh
Renovation of gravelling work by providing concrete base including other miscellaneous work at 132/ 33 kv switch yards of ramgarh sub-station (phase- ii) and west bokaro receiving sub-station under gomd-vii, dvc, ramgarh
Read moreService job for line laying, rotation, pump erection and other associated jobs for installing ash water recovery system under ahpmm through capex 2025-26.
Service job for line laying, rotation, pump erection and other associated jobs for installing ash water recovery system under ahpmm through capex 2025-26.
Read moreFor retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur
For retrofitting work of directional over current, earth fault and master trip relay on 132kv relay panel of 132kv bays at 220kv substation naubasta kanpur under etd-ii kanpur
Read moreFor the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
Read moreBituminous and concrete road restoration for laying distribution pipe line at zone-iii within gangarampur municipality under amrut 2.0
Bituminous and concrete road restoration for laying distribution pipe line at zone-iii within gangarampur municipality under amrut 2.0
Read moreProviding metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Providing metering panel board for residential qtr. (type-ii/ block-ii), type-iii/block-i and ii), type-iv and type-iv (spl), laying of power cables from the main feeder of sub-station to electric control room, main control room to womens hostel
Read moreof your Industry type