Tender Details
Particulars | Details |
---|---|
Title |
Sopd G 24 25 17 Up Gradation Of Road From Kathal R.C.C. Bridge To Silchar Hailakandi Road At Rosekandi Via Barsangon Under Sopd G For The Year 2024 25.
|
Description |
Sopd G 24 25 17 Up Gradation Of Road From Kathal R.C.C. Bridge To Silchar Hailakandi Road At Rosekandi Via Barsangon Under Sopd G For The Year 2024 25.
|
Organisation | Public Works Roads Department | State Govt. and UT |
Tender Id | 2024_PWD_39507_1 |
Reference Number |
CE/DEV/TB/232/2024-25/01 Dtd. Guwahati, 23rd September, 2024 |
Tender Fee | 20000 |
EMD | 60.2 Lakh |
Tender Value | |
Place | Cachar |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=64124 |
Start Date | October 09, 2024 19:30 |
End Date |
19/10/2024 ( Expired 212 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreSpecial repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) meerut cantt
Special repair to road from boundary of atuta gate to bigash gate (near line no 06) at mil stn babugarh under ge (north) 
 meerut cantt
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreMaintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Maintenance of road from ch.15.00 to 61.500 of nh 334a in total length of 46.500 km under performance based maintenance contract (pbmc) for the financial year 2024-25 in the state of uttarakhand
Read moreSpecial repairs to internal roads of mh secunderabad at certain location and special repairs to road infrastructure from bldg. no. p-12 to near by bldg. no. p-26/c2 of 554 asc bn and special repairs for resurfacing bitumen road , pcc road and approch
Special repairs to internal roads of mh secunderabad at certain location and special repairs to road infrastructure from bldg. no. p-12 to near by bldg. no. p-26/c2 of 554 asc bn and special repairs for resurfacing bitumen road , pcc road and approch
Read moreStrengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Strengthening of road from nh208 to fatikroy via chebri chowmuhani under kumarghat pwd r and b division under ridf xxx of nabard job no tp_com_218_2024_25
Read moreof your Industry type