Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
130889010094 Rear Mudguard Assy. Rh,130889010034 Rear Mudguard Assy. Lh,130889010044 Central
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5145823 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 10, 2024 16:04 |
| End Date |
Expired
20/07/2024
Expired 814 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | NAVABHARAT SYSTEMS AND DEVICES PRIVATE LIMITED | Make : NAVABARAT SYSTEMS AND DEIVES (P) LTD. Model : 130889010094 - Rear Mudguard Assy Title : 130889010094 - Rear Mudguard Assy | 18-07-2024 16:28:50 | MSE | Evaluated |
| 2 | SRI SARAVANAA FABS | Make : SRI SARAVANAA FABS Model : 130889010094 Title : Rear Mudguard Assy RH | 19-07-2024 11:14:03 | MSE | Evaluated |
| 3 | STAHLKIND PRIVATE LIMITED | Make : Stahlkind Model : 130889010094 Title : REAR MUDGUARD ASSY RH | 20-07-2024 12:06:37 | MSE | Evaluated |
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreRepairing and reconditioning of blade assy and both sides blade arm assy of bd355 dozers p12028 and p11978, deployed at sonepur bazari projec.
Repairing and reconditioning of blade assy and both sides blade arm assy of bd355 dozers p12028 and p11978, deployed at sonepur bazari projec.
Read moreReplacement of undercarriage and new hole making in lh sprocket boss of beml dozer sl no 13494 deployed at barmuri ocp mugma area
Replacement of undercarriage and new hole making in lh sprocket boss of beml dozer sl no 13494 deployed at barmuri ocp mugma area
Read moreProcurement of delaval nozzle assy of 200nb size for ahp nkstpp
Procurement of delaval nozzle assy of 200nb size for ahp nkstpp
Read moreProcurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Procurement of rear view mirror for non costcap shovels, 75t and 40t cranes and 12t cranes working at rgocp-iii, rg-ii area
Read moreRepairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Read moreHiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Hiring of back hoe loader with 0.26 cu.m excavating bucket at rear and 1.1 cu.m loader bucket at front for lifting of shale, stone and any other foreign material collected at oc3 chp, rg2 with 8 hours availability per day for 8640 hours or 36 months, whichever is earlier.
Read moreof your Industry type