Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
A/Mtc. W/S Scheme Palwal To...
|
Description |
A Mtc. Ws Scheme Palwal Town Distt. Palwal. Estimate Improvement Of Water Supply Scheme By Installation Of Necessary Safety Accessories, Repair Of Transformer, Installation Of Charging System In The Boosters At Palwal Town Complete In All Respect An
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_448470_1 |
Reference Number |
2025AD4D7134 824D 4F1B 964C 7003A885A613561PUH |
Tender Fee | 1680 |
EMD | 7887 |
Tender Value | |
Place | Palwal |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=525966 |
Start Date | May 23, 2025 20:30 |
End Date |
30/05/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Water locking unit (c&w item)
For complete deion and other details, please refer to tender
Read moreDye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreWork of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.
Read moreAllotment of land at chetla station yard earlier allotted to ms j s jacob
Allotment of land at chetla station yard earlier allotted to ms j s jacob
Read moreAllotment of land at chetla station yard earlier allotted to a k pathak s k pathak
Allotment of land at chetla station yard earlier allotted to a k pathak s k pathak
Read moreSurf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Surf wk with gsb 15 cm, sand blanketing, wmm 75 mm, wmm 100 mm dbm 50 mm and bc 30 mm thick, prime and tack coat, earthen shoulders and rd marking bet km 0.00 to km 14.457 on rd tang-s/chingnyu under 100 rcc/15 brtf under (p) sewak in nagaland state
Read moreMaster sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Master sewerage scheme faridabad- designing, construction and commissioning of 20 mld capacity stp on sbr technology with tertiary treatment to achieve the required parameters with 03 months trial run, 10 years of o and m etc.
Read moreJjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Jjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Read moreAAAAAAAAAA
Login to viewRehabilitation of hinglow dam with ancillary structures special repair to spillway gate structure and its embedded parts under the world bank assisted scheme drip ii
Read moreS/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)
S/r of bhadson tarkheri road (odr-52) l-9.52 km distt. patiala under head-5054 rb-10 fy 2025-26 with 5 year routine maintenance after completion of work (2nd year to 5th year) (1st year will be considered as defect lability period)
Read moreof your Industry type