Tender Details

Particulars Details
Title
Comprehensive Inspection Testing Of Lpg Pipeline Liquid And Vapour At Indane Bottling Plant Cochin Kerala
Description
Comprehensive Inspection Testing Of Lpg Pipeline Liquid And Vapour At Indane Bottling Plant Cochin Kerala
Organisation IndianOil Corporation Limited(IOCL)
Tender Id 2023_KESO_168580_1
Reference
Number
4272/2023-24/TESTING/LPG-PL
Tender Fee -
EMD 0
Tender Value -
Place INDANE BOTTLING PLANT COCHIN
Link
View Original Tender Notice

https://iocletenders.nic.in

Start Date July 14, 2023 19:30
End Date
Expired 24/07/2023

Expired 1180 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Eoi 12 for transportation of indane lpg cylinders in vertical position on unit rate basis ex korba lpg bottling plant

Eoi12 for transportation of indane lpg cylinders in vertical position on unit rate basis ex korba lpg bottling plant

Read more
Transportation of indane lpg cylinders in vertical position on unit rate basis ex gunalpg bottling plant

Transportation of indane lpg cylinders in vertical position on unit rate basis ex gunalpg bottling plant

Read more
Transportation of indane lpg cylinders in vertical position on unit rate basis ex- murbad bottling plant.

Transportation of indane lpg cylinders in vertical position on unit rate basis ex- murbad bottling plant.

Read more
Expression of interest (eoi) from existing distributors attached to illayangudi iocl bottling plant for own load transportation of indane lpg cylinders in vertical position on unit rate basis ex_ illayangudi iocl lpg bottling plant under tnso

Expression of interest (eoi) from existing distributors attached to illayangudi iocl bottling plant for own load transportation of indane lpg cylinders in vertical position on unit rate basis ex_ illayangudi iocl lpg bottling plant under tnso

Read more
3 inch wagon unloading arm lpg liquid,2 inch wagon unloading arm lpg vapour,swivel joint seal kit for 3 inch ung arm,swivel joint seal kit for 2 inch ung arm,supervision during installation & commissioning

3 inch wagon unloading arm lpg liquid,2 inch wagon unloading arm lpg vapour,swivel joint seal kit for 3 inch ung arm,swivel joint seal kit for 2 inch ung arm,supervision during installation & commissioning

Read more
Laying 6.625in od pipeline with / without ofc conduit through horizontal directional drilling method hdd for crossing across beas river in extension of panipat jalandhar lpg pipeline pjpl from jalandhar to goindwal sahib bottling plant

Laying 6.625in od pipeline with / without ofc conduit through horizontal directional drilling method hdd for crossing across beas river in extension of panipat jalandhar lpg pipeline pjpl from jalandhar to goindwal sahib bottling plant

Read more
Attending comprehensive inspection, major overhauling of engine with spares, logistics, testing, and commissioning of the 75 ton capacity hind crawler crane (101 mk) stationed at campbell bay, nicobar district - 744302.

Attending comprehensive inspection, major overhauling of engine with spares, logistics, testing, and commissioning of the 75 ton capacity hind crawler crane (101 mk) stationed at campbell bay, nicobar district - 744302.

Read more
Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv

Mtps i tm i unit ii inspection and overhauling of oil vapour extraction fan assembly cleaning hydraulic testing of turbine lube oil cooler seal oil cooler overhauling of nrv gate valve cleaning of strainer assembly and cooling water lines of esv iv

Read more
Supply, installation, integration, testing and commissioning of smart sv system for 4 (four) sv stations of ksppl under ksppl palakkad-salem lpg pipeline project and annual maintenance contract of the supplied system for a perio

Supply, installation, integration, testing and commissioning of smart sv system for 4 (four) sectionalizing valves stations of ksppl under ksppl palakkad-salem lpg pipeline project and annual maintenance contract of the supplied system

Read more
Comprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.

Comprehensive annual maintenance contract (camc) of 14 (fourteen) nos. electric driven air compressors with air dryer and inspection, testing and certification of 14 (fourteen) nos. pressure vessels as per statutory requirement, calibration of pressure safety valve and pressure gauges installed at crw/hrt.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise