Tender Details

Particulars Details
Title
Breaking And Scrapping Of Vessel Ins Sindhudvaj Including Labour Charge, All Consumables,Machineries, Loading,Etc Complete As Directed By Silk But Excluding The Cost Of Lpg And Oxygen
Description
Breaking And Scrapping Of Vessel Ins Sindhudvaj Including Labour Charge, All Consumables,Machineries, Loading,Etc Complete As Directed By Silk But Excluding The Cost Of Lpg And Oxygen
Organisation Steel Industrials Kerala Ltd | State Govt. and UT
Tender Id 2024_SILK_674159_1
Reference
Number
ASBU/SB/INS /2024-25/170
Tender Fee 2950
EMD 50000
Tender Value -
Place Azhikkal
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1048535

Start Date June 03, 2024 23:00
End Date
Expired 10/06/2024

Expired 857 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr

Read more
Breaking and scrapping of tug boat thiruvalluvar including labour charge, all consumables, machineries, loading, etc. complete as directed by silk but excluding the cost of lpg and oxygen

Breaking and scrapping of tug boat thiruvalluvar including labour charge, all consumables, machineries, loading, etc. complete as directed by silk but excluding the cost of lpg and oxygen

Read more
Fitting of led 25 watts crompton greaves consumer electricals street light with accessories including labour charge but excluding led street light

Fitting of led 25 watts crompton greaves consumer electricals street light with accessories including labour charge but excluding led street light

Read more
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge. .

Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Making ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge..

Making ramp, staire case slope at karauti pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of v.r.b. at chhitauni pump canal including all cost of material (excluding cement and bricks), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Construction of boundry wall at niyardih ii feeder pump canal including all cost of material (excluding cement), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge.

Read more
Making ramp, staire case and slope at karauti pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge

Making ramp, staire case and slope at karauti pump canal including all cost of material (excluding cement ), labour, t and p used complete in all respects as per drawing provided by department. as directed by engineer in charge

Read more
Costruction oframp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge

Costruction oframp and staire case at newajganj east pump canal including all cost of material, (excluding cement) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge

Read more
Concrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Concrete payment block interlocking work in compound at balua pump canal including all cost of material, (excluding cement ) labour, t and p used, complete in all respect as per drawing provided by department. as directed by engineer in charge.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise