Particulars | Details |
---|---|
Title |
Restoration Of Damaged Coal Bunker 3 D Coal Mills Coal Feeders Coal Pipes Mill Motors Electrical And Instrumentation Accessories Other Structures And Pipe Lines Including Fabrication Supply Erection Testing And Commissioning In Unit Iii
|
Description |
Restoration Of Damaged Coal Bunker 3 D Coal Mills Coal Feeders Coal Pipes Mill Motors Electrical And Instrumentation Accessories Other Structures And Pipe Lines Including Fabrication Supply Erection Testing And Commissioning In Unit Iii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_526377_1 |
Reference Number |
CE / MTPS-I / SE / M-I / MP/ OT. 306 / 2024-25 |
Tender Fee | 0 |
EMD | 1.27 Crore |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=626798 |
Start Date | February 20, 2025 17:30 |
End Date |
06/03/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv sub stations and lines construction of new 33 kv lines augmentation of existing 33 kv lines and
Empanelment of electrical contractors for a period of two years for supply of material erection testing commissioning of augmentation of existing 33 kv substations and lines construction of new 33 kv lines augmentation of existing 33 kv lines
Read moreDesign, engineering, manufacturing/fabrication, supply, installation, erection, testing commissioning etc. of utility systems, utility piping, fire fighting systems, material handling equipment, electrical, control instrumentation systems
Design, engineering, manufacturing/fabrication, supply, 
 installation, erection, testing commissioning etc. of utility systems, utility 
 piping, fire fighting systems, material handling equipment, electrical, control instrumentation systems
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Read moreRefurbishment of existing 2000amps 6.6kv, vcb panels including supply, delivery,erection, testing and commissioning of 6.6kv ht vcb panels at ph-i of 132/6.6kv sub-statios bearing housing and vcbs for 1425kw, 1475kw and 1300kw pump sets at kodandapur, nasarlapally and godakondla under eam section, electrical sub division,td-iii, sahebnagar
Refurbishment of existing 2000 amps 6.6 kv, vcb panel including supply, delivery, erection, testing and commissioning of 6.6kv ht vcb panels at phase-i of 132 6.6kv substations, bearing housing and vcbs for 1425kw, 1475 kw and 1300 kw pump sets at kodandapur, nasarlapally and godakondla under eam section electrical sub division, transmission division no.iii, sahebnagar.
Read moreDesign, supply, fabrication, erection, testing and commissioning of 25kl under ground bulk high speed sel storage tank in the existing pit, including necessary civil and electrical work complete
Design, supply, fabrication, erection, testing and commissioning of 25kl under ground bulk high speed sel storage tank in the existing pit, including necessary civil and electrical work complete with safety certification and license from the chie
Read moreSupply laying installation testing and commissioning of instrumentation cables and control cables for fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5
Supply laying installation testing and commissioning of instrumentation cables and control cables for 
 fgd plant of ramagundam stpp unit 7 stage iii 1x500mw lot 5
Read moreNctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3d during shutdown of unit
Nctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3d during shutdown of unit
Read moreNctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3c during shutdown of unit
Nctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3c during shutdown of unit
Read moreNctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3b during shutdown of unit
Nctpsi semii circleahp dn pdfacsuniti design supply fabrication erection testing and commissioning of pdfac system in esp field 3b during shutdown of unit