Tender Details
Particulars | Details |
---|---|
Title |
Work Of Repairing And Overhauling Of Brine Pump And Dosing Pump Of Electro Chlorination Plant At Trombay Low Level Reservoir Under Aemwwesii
|
Description |
Work Of Repairing And Overhauling Of Brine Pump And Dosing Pump Of Electro Chlorination Plant At Trombay Low Level Reservoir Under Aemwwesii
|
Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
Tender Id | 2025_MCGM_1183465_1 |
Reference Number |
DyHE/1447/M dt.22.05.2025 |
Tender Fee | 929 |
EMD | 2800 |
Tender Value | |
Place | TLLR |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2053699 |
Start Date | May 26, 2025 19:40 |
End Date |
04/06/2025 ( Expired 3 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreDevelopment work of mrf and compost plant, under sbm-2, barghat
Development work of mrf and compost plant, under sbm-2, barghat
Read moreSurface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreSpecial repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Special repair for replacement of water treatment plant of capacity 90000 lph against ber at main pump house at comd hosp (ec) under ge(a) kolkata
Read moreWork of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Work of repairing, grouting and painting of m.s. angle of cable trenches of 400/220kv switchyard at 400kv sub-station, kashipur
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreSpecial repair to joinery and carpentry work in respect of jcos / or md accn in dstv area under age b/r i of ge hisar at hisar mil stn.
Special repair to joinery and carpentry work in respect of jcos / or md accn in dstv area under age b/r i of ge hisar at hisar mil stn.
Read moreCanal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including 5 years operation and maintenance part 2 at ghanaur district patiala punjab under amrut 2.0 scheme
Read moreof your Industry type