Tender Details
About Tender
🚂 Procurement Opportunity: Enhancement Of Power Supply At Lc Gates 🔌 The Ministry Of Railways, Under The Central Government, Invites Bids For The Provision Of Electoral Ballast (Elb) Systems, Replacement Of Metering And Load Breaking (Mlb) Units, Installation Of Remote Terminal Units (Rt Us), And Upgradation Of Power Supply Arrangements At Interlocked Level Crossing (Lc) Gates Under The Adste/Rri Section. 📅 Bid Submission Deadline: May 13, 2024, 3:00 Pm Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 189,500. Bids Should Be Detailed, Addressing All Technical And Financial Aspects Of The Project, And Adhere To The Tender Specifications. Keywords: Ministry Of Railways, Power Supply, Lc Gates, Adste/Rri, Elb, Mlb, Rt Us, Government Tender, Central Govt. Ministry/DepartmentParticulars | Details |
---|---|
Title |
Provision Of Elb In Place Of Mlb, Provision Of Rt Us And Improvement Of Power Supply Arrangements In Interlocked Lc Gates Under Adste/Rri Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 74690244 |
Reference Number |
558-Sig-16-M-Tender-1421 |
Tender Fee | 0 |
EMD | 1.9 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/052024/74690244/viewNitPdf_4542048.pdf |
Start Date | April 18, 2024 23:17 |
End Date |
13/05/2024 ( Expired 393 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreRe-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh7 (design chainage 501.930 to 531.330) and nepali farm motichur section of nh34 (dc 531.330 to 538.750) on epc mode in uttarakhand under nh(o)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRepair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Repair of rehabilitation and upgradation of digras darwha karanja section in (km 0.000 to 74.351) nh 361c two lanes with paved shoulder configuration in the state of maharashtra.(under risk and cost).
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreStructural rehabilitation work and improvement of reservoir, dam, outlet and basic facilities of myntdu leshka stage-i dam in west jaintia hills district of meghalaya under drip-ii (package-viii)
Structural rehabilitation work and improvement of reservoir, dam, outlet and &#x0d basic facilities of myntdu leshka stage-i dam in west jaintia hills district of &#x0d meghalaya under drip-ii (package-viii)
Read moreProviding gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Providing gangs for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds circle sangur on per day basis.
Read moreThe work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.
The work of strengthening and improvement of water supply distribution network in the jurisdiction of jaipur nagar nigam greater under amrut 2.0 district- jaipur.
Read moreof your Industry type