Tender Details
Particulars | Details |
---|---|
Title |
For Special Strengthening Work Of 1. Alejhari Kaspur Road Length 1.50 Km 2. Garra Ekodi Road Length 2.00 Km 3. Kalagota Pipariya Road Length 2.20 Km 4. Wara Alejhari Road Length 5.00 Km Total Length 11.70 Km.
|
Description |
For Special Strengthening Work Of&Amp#X0d
1. Alejhari Kaspur Road Length 1.50 Km&Amp#X0d
2. Garra Ekodi Road Length 2.00 Km&Amp#X0d
3. Kalagota Pipariya Road Length 2.20 Km&Amp#X0d
4. Wara Alejhari Road Length 5.00 Km Total Length 11.70 Km.
|
Organisation | PWD- Roads and Bridges | State Govt. and UT |
Tender Id | 2025_PWDRB_412811_1 |
Reference Number |
30-4/SAC/2024-25 BALAGHAT DATE 27/03/2025 |
Tender Fee | 16534 |
EMD | 3.81 Lakh |
Tender Value | |
Place | CHIEF ENGINEER (C.Z.) P.W.D. JABALPUR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=487417 |
Start Date | March 29, 2025 23:00 |
End Date |
15/04/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreShort term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreShort term maintenance contract (stmc) work from km 106/2-133/2 of thanjavur - perambalur - attur road of nh-136 in the state of tamil nadu for the year 2024-25
Short term maintenance contract (stmc) work from km 106/2-133/2 of thanjavur perambalur attur road of nh-136 in the state of tamil nadu for the year 2024-25
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreRoutine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-1 from km 211.000 to km 294.000 of nh 44 (total length 83.00 km) in the state of andhra pradesh
Routine maintenance including incident management for operation and maintenance of hyderabad-bangalore section-1 from km 211.000 to km 294.000 of nh 44 (total length 83.00 km) in the state of andhra pradesh
Read moreG.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
G.t. road (sh-2) from 674.35 km to 674.55 km, 675.20 km to 675.70 and 676.10 km to 676.36 km, strengthening work under howrah division in the district of howrah.
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for ase for supervision of constr of dslc road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km) under (p) vtk in the state of arunachal pradesh through epc mode
Read moreof your Industry type