Tender Details

Particulars Details
Title
Repairing/Fabrication Of Of View Point, Rest Shelter And Fencing Of Kuju New Siding Substation Along With Lightning Arrester Arrangement With Earth Pit At Topa Project Under Kuju Area.
Description
Repairing/Fabrication Of Of View Point, Rest Shelter And Fencing Of Kuju New Siding Substation Along With Lightning Arrester Arrangement With Earth Pit At Topa Project Under Kuju Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318190_1
Reference
Number
GM (K)/EnM/eTender/24-25/155
Tender Fee 0
EMD 5400
Tender Value
Place GM UNIT KUJU
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=329812
Start Date September 26, 2024 00:25
End Date

05/10/2024 ( Expired 198 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provision of temporary rain shed for acrr pantry with over access path and explosive disposal area (cooling-off pit) at shibpur under ge (s) diglipur

Provision of temporary rain shed for acrr pantry with over access path and explosive disposal area (cooling-off pit) at shibpur under ge (s) diglipur

Read more
Repair maintenance and servicing of dg sets with connected works at new and old corps area under aor of ge 865 ews

Repair maintenance and servicing of dg sets with connected works at new and old corps area under aor of ge 865 ews

Read more
Repaire replacement maintenance of earthing and lightening arrester la with connected accessories at various bldgs hangers, labs at eetf csl cpdc elsec and other connected area etc under ge i rnd rci hyderabad

Repaire replacement maintenance of earthing and lightening arrester la with connected accessories at various bldgs hangers, labs at eetf csl cpdc elsec and other connected area etc under ge i rnd rci hyderabad

Read more
Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ac and af block, aa ia under newtown division

Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ac and af block, aa ia under newtown division

Read more
Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund

Removal and clearance of weed growth, shurbs, and jungle bushes along bcw complex area at baggi and distempering and painting of baggi rest camp building along with fabrication of steel platform for old for old emergency gate at bcw complex bbmb sund

Read more
Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ab and ae block, aa ia under newtown division

Drawal of lt and ht ug cables along with installation of new dtrs, lt kiosks, fpbs, dbs for lt ug ringmain works at ab and ae block, aa ia under newtown division

Read more
Attending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua

Attending day to day petty repair works, misc b/r works and replacement of old type u/s tube light fittings with new type energy efficient led light fittings in ms unit and air wing area at arc doom dooma under ge (af) chabua

Read more
Maintenance and erection of sky netting with earthing arrangement at main substation and colony substation of tsocp under hzb area.

Maintenance and erection of sky netting with earthing arrangement at main substation and colony substation of tsocp under hzb area.

Read more
Construction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0 phase-iii within amc

Construction of rcc ohr along with land development approach road guard room and boundary wall&amp#x0d ....... in all respect of proposed water supply scheme at new budha zone-29 asansol under amrut 2.0&amp#x0d phase-iii within amc

Read more
Cleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.

Cleaning of existing garland drain of length 1360.00 mt and cutting of new garland drain of length 1401 mt at different locations in mines for monsoon preparation work under karma project of kuju area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise