| Particulars | Details |
|---|---|
| Title |
Assembling Laying And Linking Of Railway Track With Contractors Own P Way Materials Except Rails Ballast And Sleepers And All Other Allied Works Required For Commissioning Of Railway Line Between Sendurgarh 67 Km To Pendra Road 135 Km Double Line
|
| Description |
Assembling Laying And Linking Of Railway Track With Contractors Own P Way Materials Except Rails Ballast And Sleepers And All Other Allied Works Required For Commissioning Of Railway Line Between Sendurgarh 67 Km To Pendra Road 135 Km Double Line
|
| Organisation | IRCON International Limited | Public Sector Undertakings |
| Tender Id | 2024_IRCON_182027_1 |
|
Reference Number |
BSP 65 |
| Tender Fee | 50000 |
| EMD | 55.09 Lakh |
| Tender Value | - |
| Place | Pendra Raod |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=199252 |
| Start Date | February 01, 2024 14:30 |
| End Date |
Expired
08/02/2024
Expired 983 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreP.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
P.way ( track) linking work on railway formation along with linking to existing line at tangarbansali yard including supply of ballast at tangarbansali of ranchi divsion.
Read moreUltrasonic testing of rails including through testing of rails and welds with contractor s own b-scan machines equipped with 9 channels srt/drt and two extra 37 degree probes and operators on nominated routes over south eastern railway including hand probing (flange testing) of welds as per indian railway standard specification for ultrasonic testing of rails/welds, revised-2020 (document no. t-53) and manual for ultrasonic testing of rails and welds, revised 2022 (with latest amendment)
Ultrasonic testing of rails including through testing of rails and welds with contractor s own b-scan machines equipped with 9 channels srt/drt and two extra 37 degree probes and operators on nominated routes over south eastern railway including hand probing (flange testing) of welds as per indian railway standard specification for ultrasonic testing of rails/welds, revised-2020 (document no. t-53) and manual for ultrasonic testing of rails and welds, revised 2022 (with latest amendment)
Read moreConstruction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Construction of new railway line between deshalpar - hajipir - luna (82.38kms) (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works i
Read moreConstruction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Construction of new railway line between vayor - lakhpat (including all yards falling in the section) covering all works of earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs all p. way works (including laying and linking), supply of all types of sleepers, p. way fittings (excluding rails, steel girder), other civil engineering works, signal, telecom and electrical (general services and trd) complete works in ahmedabad division
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreConstruction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi
Read moreFlash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway
Flash butt welding of uic 60kg r260/90 uts 20 rail panels (new/in-service) in track under traffic block in mid-section and station yards using contractor s own rail cum road vehicle mounted flash butt mobile welding plant and flash butt welding of 90 uts rails using contractor s self-propelled rail cum road / mobile fbw plants in loop lines as per railway s specifications in the track renewal works, over south central railway
Read moreConstruction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Construction of 2nd new railway line (doubling works) between section kanalus(including) - okha (including) from km:853.36 to km:994.35 (including all yards and stations falling in the section) covering all works that are earthwork, blanketing, retaining wall, toe wall, side drain, construction of major bridges, minor bridges, rub/lhs, all p. way works (including laying and linking), supply of all types of sleepers, all p. way fittings, other civil engineering works, signal & telecommunica
Read moreAssembling,laying, linking of rly track with contractors own p way materials (except rails, ballast and sleepers) and .. between.. (excluding) double line, ..in c/w the const of new bg el double railway line for.. in chhattisgarh over secr