Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Erection And Commissioning Of Stacker Reclaimer 1operator Cabin For Ntpc Ramagundam Chp.
|
| Description |
Supply Erection And Commissioning Of Stacker Reclaimer
1operator Cabin For Ntpc Ramagundam Chp.
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_96094_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900300069 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Ramagundam Super Thermal Power Station |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=99309 |
| Start Date | April 09, 2025 21:30 |
| End Date |
Expired
11/04/2025
Expired 549 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreAnnual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Annual maintenance service contract for skf-lincoln make centralized dual line lubrication systems at the new stacker reclaimer machine in chp, ktps v and vi stages for the year 2026-27.
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreProcurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Procurement of hydraulic system spares required for stacker cum reclaimers working in chp at stpp, jaipur, mancherial, telangana.
Read moreReplacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Replacement of damaged slew bearing with new one at trf make stacker cum reclaimer machine in coal handling plant of ktps-v and vi stages.
Read moreDc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreProcurement of spare softstarters for chp stacker reclaimer/reclaimer,
Procurement of spare softstarters for chp stacker reclaimer/reclaimer,barrage pumps of ntpc north karanpura stpp
Read moreof your Industry type