Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Of Dak Bunglow Road From Gomati Jatri Nivas To Nh 8.
|
| Description |
Bituminous Concrete, Metalling, Gsb, Laying Of Paver And Construction Of Rcc Road Side Cover Drain Including Road Markings And Sign Boards During The Year 2025 26. (Under Ridf Xxxi Of Nabard).
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2026_CEPWD_69098_1 |
|
Reference Number |
DNIT No. 37/CE/PWD(RnB)/ACE (PnDU)/2025-26 |
| Tender Fee | 8000 |
| EMD | 8.17 Lakh |
| Tender Value | - |
| Place | Udaipur |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=70312 |
| Start Date | January 12, 2026 22:35 |
| End Date |
Expired
28/01/2026
Expired 240 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenance of dak bunglow road from gomati jatri nivas to nh-8/sh bituminous macadam and concrete, metalling, gsb, laying of paver and maintenance of road side drain during the year 2025-26
Maintenance of dak bunglow road from gomati jatri nivas to nh-8/sh bituminous macadam and concrete, metalling, gsb, laying of paver and maintenance of road side drain during the year 2025-26
Read moreWidening and strengthening of gomati bridge di (odr)
Widening and strengthening of gomati bridge di (odr)
Read moreRe-strengthening and widening of road from nh-8 to amrakh ji mahadev temple. 5502
Re-strengthening and widening of road from nh-8 to amrakh ji mahadev temple. 5502
Read moreNh-116b (digha foreshore road), from 82.30km to 83.10km widening and strengthening work......
Nh-116b (digha foreshore rd), from 82.30 to 83.10km widening and strengthening work (5.50 to 10.0m) and from 83.10 to 84.835 km and 86.335 to 88.80 km, widening and strengthening work (from 7.00 to 11.00 m) with raised footpath under tamluk hway divn
Read moreNh-116b (digha foreshore road), from 82.30km to 83.10km widening and strengthening work...
Nh-116b (digha foreshore road), from 82.30 to 83.10km widening and strengthening work (from 5.50 to 10.0 m) and from 83.10 to 84.835 km and 86.335 to 88.80 km, widening and strengthening (from 7.00 to 11.00 m) with raised footpath under tamluk highwa
Read moreWidening and strengthening of road mahwa palakhari sawdi nh-248a
Widening and strengthening of road mahwa palakhari sawdi nh-248a
Read moreWidening and strengthening to nh-26 from km 367/480 to 376/480 km in
Widening and strengthening to nh-26 from km 367/480 to 376/480 km in the state of odisha under epc mode
Read moreWidening and strengthening work of siwar hanumangarhi link road from nh-27 in ayodhya district.
Widening and strengthening work of siwar hanumangarhi link road from nh-27 in ayodhya district.
Read moreProposed strengthening and widening and black topping road from income tax office to wadharwadi via collectors bunglow for jalna.
Proposed strengthening and widening and black topping road from income tax office to wadharwadi via collectors bunglow for jalna.
Read moreWork of widening and strengthening of the road (odr) from nh-31 to murli chhapra block
Work of widening and strengthening of the road (odr) from nh-31 to murli chhapra block
Read moreof your Industry type