Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Evident Olympus Binocularr Stereomicroscope Szx7,Warranty For Second Year,Warranty For Third Year,W
|
| Description |
|
| Organisation | NA | Ministry of Environment Forest and Climate Change |
| Tender Id | GEM/2024/B/5366206 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 05, 2024 22:51 |
| End Date |
Expired
27/09/2024
Expired 748 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DSS IMAGETECH PRIVATE LIMITED
958046
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | DSS IMAGETECH PRIVATE LIMITED | - | 24-09-2024 13:15:04 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | DSS IMAGETECH PRIVATE LIMITED | Item Categories : Evident Olympus Binocularr Stereomicroscope SZX7,Warranty for second year,Warranty for third year,W | 958046.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Evident Olympus Binocularr Stereomicroscope SZX7 | NA | BOQ Item | 3 | ₹ 888426.000 |
| Warranty for second year | NA | BOQ Item | 1 | ₹ 11800.000 |
| Warranty for third year | NA | BOQ Item | 1 | ₹ 15340.000 |
| Warranty for fourth year | NA | BOQ Item | 1 | ₹ 18880.000 |
| Warranty for fifth year | NA | BOQ Item | 1 | ₹ 23600.000 |
Upgradation of olympus szx7 stereo binocular microscope from the existing“ stream basic” software to
Upgradation of olympus szx7 stereo binocular microscope from the existing“ stream basic” software to
Read moreSupply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Supply, installation and commissioning of gas generator,post warranty first year camc,post warranty second year camc,post warranty third year camc
Read moreHp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Hp color laserjet managed multifunction printer (mfp),camc-warranty- first year,camc-warranty- second year,camc-warranty- thrid year
Read moreTender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Tender for providing vitrified tile flooring in the first second and third floor corridor at nsic stbp chennai
Read moreKone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Kone make 8 passenger lift 1 for first year,kone make 8 passenger lift 1 for second year,kone make 8 passenger lift 1 for third year,kone make 8 passenger lift 2 for first year,kone make 8 passenger lift 2 for second year,kone make 8 passenger lift 2 for third year
Read moreRepairing the roof top of the second floor and third floor of raurkela municipal corporation office building to prevent from leakage , ward no. 28, under rmc, rourkela
Civil work
Read moreSafety lock spring assembly for bobrn consisting of 3 items- a) back plate,b)second palte and c)third plate.rdso.drg.no. wd- 92081 - s - 56. item. 1. alt-5.
Safety lock spring assembly for bobrn consisting of 3 items- a) back plate,b)second palte and c)third plate.rdso.drg.no. wd- 92081 - s - 56. item. 1. alt-5.
Read moreSupply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Supply, installation, testing and commissioning of air conditioning system and fire fighting works for proposed pdic building second, third and fourth floor (a-block and d-block), be-bg.
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreSterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Sterile ice slush making machine,single user container,cmc first year,cmc second year,cmc third year,cmc forth year,cmc fifth year,cmc sixth year,cmc seventh year,cmc eighth year
Read moreof your Industry type