Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Earth Work In Excavation Upto Required Depth Below Existing Ground Level,Supplying And Spreading St
|
| Description |
|
| Organisation | Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5168245 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 16, 2024 22:36 |
| End Date |
Expired
30/07/2024
Expired 807 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | ABC ENTERPRISES | - | 28-07-2024 16:19:43 | MII | Qualified |
| 2 | CLASSIC CONSTRUCTION | - | 22-07-2024 16:12:14 | MII MSE | Qualified |
| 3 | Dev Enterprises | - | 18-07-2024 12:30:54 | MII MSE | Qualified |
| 4 | ELE-MECH ENGINEERING SERVICES | - | 19-07-2024 15:31:55 | MII MSE | Qualified |
| 5 | ELIDE ENTERPRISES | - | 27-07-2024 16:50:19 | MII MSE | Disqualified |
| 6 | KISHAN SINGH CONTRACTOR | - | 29-07-2024 21:31:21 | MII MSE | Qualified |
| 7 | M/s Samar Enterprises | - | 30-07-2024 14:05:56 | MII MSE | Qualified |
| 8 | N S CONSTRUCTION | - | 29-07-2024 19:03:40 | MII MSE | Qualified |
| 9 | PANCHVATI CONSTRUCTION COMPANY | - | 27-07-2024 16:59:19 | MII | Disqualified |
| 10 | PURUSHOTTAM SINGH | - | 27-07-2024 23:13:00 | MII MSE | Qualified |
| 11 | R P CONTRACTORS | - | 24-07-2024 07:13:28 | MII MSE | Qualified |
| 12 | Rajesh Construction | - | 25-07-2024 16:11:13 | MII MSE | Qualified |
| 13 | RAVINDRA CONTRACTOR | - | 29-07-2024 14:43:37 | MII MSE | Qualified |
| 14 | S.K. ENTERPRISES | - | 29-07-2024 11:52:18 | MII MSE | Qualified |
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Read moreDismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Dismantling existing wall,excavation upto 1.5,excavation below 1.5,pcc for footing base 1 is to 4 is to 8,rcc below plinth footing and pillar and beam,rcc above plinth pillar,brick mason wall av plinth,pcc on top of bw,plaster 18mm thick,two coat cement primer,two coat cement paint,slogan writing letters 300 mm,steel reinforcement for rcc,concertina fencing removal and refixing,jcb related work,brick masonry drain,plaster 12 mm thick
Read moreConstruction of new operational boundary wall in place of old damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport agartala
Construction of new operational boundary wall in place of old damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport agartala
Read moreAnnual clearance of road berm upto premix top level, removing of un-wanted excavated earth/ wet silt from berm and side drains, deep drains having road length of different carriage way 11km. cleaning of premises around estate civil electrical win
Annual clearance of road berm upto premix top level, removing of unwanted excavated earth wet silt from berm and side drains deep drains having road length of different carriage way 11km cleaning of premises around estate civilelect wi
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreSupply and installation of earth leakage detector (8 channel) level-2 as per rdso specification no. rdso/spn/256/2025 version : 2.0 or latest inspection by rdso. wiring from power supplies in ctr/ips etc to eld to be done by firm. all material required to be supplied by firm.
Supply and installation of earth leakage detector (8 channel) level-2 as per rdso specification no. rdso/spn/256/2025 version : 2.0 or latest inspection by rdso. wiring from power supplies in ctr/ips etc to eld to be done by firm. all material required to be supplied by firm.
Read moreRewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply
Rewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreElectrical handtool kit multipurpose set,led torch twenty two hundred mah,adjustable spanners soft grip,combination pliers insulated with thick sleeve,long nose pliers,wire stripping pliers,black tip two in one screw drivers,line tester,digital tester,club hammer with handle,pipe vices,l spanners,box spanner size 30 x 32 and length 400 mm,ring spanners size 30 x 32,allenky sets,plumber tool kit,digital earth resistance tester,pipe die set size 25mm,pipe die set size 50mm,combination spanner sets,hacksaw frames size 200,hacksaw blade size 200,discharge rod 11 kv diameter 40mm dia,gloves ultrane 533 uflit polyurethan size 9,hillson workout high b24 ankle steel toe black work safety shoes,flat chisels,spirit level,safety helmet,safety belt harness full adjustable single hock and single rope,lpg single nosle brazing blow torch with manual ignition and two butter canister refill,gkfml fiber glass 30m fiber plastic measuring tape,laser distance measure upto 40m range,portable cordless compact air pump for two
Electrical handtool kit multipurpose set,led torch twenty two hundred mah,adjustable spanners soft grip,combination pliers insulated with thick sleeve,long nose pliers,wire stripping pliers,black tip two in one screw drivers,line tester,digital tester,club hammer with handle,pipe vices,l spanners,box spanner size 30 x 32 and length 400 mm,ring spanners size 30 x 32,allenky sets,plumber tool kit,digital earth resistance tester,pipe die set size 25mm,pipe die set size 50mm,combination spanner sets,hacksaw frames size 200,hacksaw blade size 200,discharge rod 11 kv diameter 40mm dia,gloves ultrane 533 uflit polyurethan size 9,hillson workout high b24 ankle steel toe black work safety shoes,flat chisels,spirit level,safety helmet,safety belt harness full adjustable single hock and single rope,lpg single nosle brazing blow torch with manual ignition and two butter canister refill,gkfml fiber glass 30m fiber plastic measuring tape,laser distance measure upto 40m range,portable cordless compact air pump for two
Read moreof your Industry type