Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pr11924/225/01 Repair Of Bottom Shaft Of Generating Unit No.03 Of Parbati Iii Power Station
|
| Description |
Repair Of Bottom Shaft Of Generating Unit No 03 Of Parbati Iii Power Station
|
| Organisation | NHPC Limited | Central Govt. Ministry/Department |
| Tender Id | 2025_NHPC_851922_1 |
|
Reference Number |
PR11924/225/01-Repair of Bottom Shaft of Generating Unit no.03 of Parbati-III Power Station |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | PARBATI-III POWER STATION, BEHALI |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=895589 |
| Start Date | March 05, 2025 20:30 |
| End Date |
Expired
12/03/2025
Expired 584 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of bottom horizontal pressure shaft of power house after failure of manhole of pressure shaft of parbati-ii power station, sainj, distt. kullu (hp) (package no-c-878)
Repairing of bottom horizontal pressure shaft of power house after failure of manhole of pressure shaft of parbati-ii power station, sainj, distt. kullu (hp) (package no-c-878)
Read moreSupply, dismantling, erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler system, sgtps, mppgcl, birsinghpur.
Supply, dismantling, erection and commissioning of apron feeder bottom hopper chute installed at wagon tippler system, sgtps, mppgcl, birsinghpur.
Read moreConstruction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Construction of 50 nos. bricks ventilation stoppings in g-iii bottom seam at bagdewa ug mine, korba area.
Read moreProcurement of complete runner shaft assembly for core air fan labyrinth shaft seal for andrew yule co. ltd. make 2235 dia. si. bcb 11 primary air fan installed unit no. 3 and 4 ph ii, sgtps, mppgcl, birsinghpur.
Procurement of complete runner shaft assembly for core air fan labyrinth shaft seal for andrew yule co. ltd. make 2235 dia. si. bcb 11 primary air fan installed unit no. 3 and 4 ph ii, sgtps, mppgcl, birsinghpur.
Read moreProcurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreProcurement of spares for san make 800 hp diesel locomotive of chp-iii, stps, mppgcl, sarni.
Procurement of spares for san make 800 hp diesel locomotive of chp-iii, stps, mppgcl, sarni.
Read moreLv7 sml amb bs iii nk crank shaft,lv7 sml amb bs iii nk kit clutch disc and cover assy,lv7 sml amb bs iii nk minor rep kit air comp,lv7 sml amb bs iii nk engine overhaul kit,lv7 sml amb bs iii nk turbo charger,lv7 sml amb bs iii nk alternator 12v 55 amp,lv7 sml amb bs iii nk all type fuel pipe,lv7 sml amb bs iii nk delivery valve,lv7 sml amb bs iii nk cam shaft,lv7 sml amb bs iii nk control rack,lv7 sml amb bs iii nk governor assy,lv7 sml amb bs iii nk fuel feed pump assy
Lv7 sml amb bs iii nk crank shaft,lv7 sml amb bs iii nk kit clutch disc and cover assy,lv7 sml amb bs iii nk minor rep kit air comp,lv7 sml amb bs iii nk engine overhaul kit,lv7 sml amb bs iii nk turbo charger,lv7 sml amb bs iii nk alternator 12v 55 amp,lv7 sml amb bs iii nk all type fuel pipe,lv7 sml amb bs iii nk delivery valve,lv7 sml amb bs iii nk cam shaft,lv7 sml amb bs iii nk control rack,lv7 sml amb bs iii nk governor assy,lv7 sml amb bs iii nk fuel feed pump assy
Read moreManufacture and supply of roller journal shafts for bhel make xrp-883, 210 mw at ph-iii, atps, chachai
Manufacture and supply of roller journal shafts for bhel make xrp-883, 210 mw at ph-iii, atps, chachai
Read moreAnnual work contract for maintaining sufficient quantity of filled hydrogen cylinders in all units of ph-i, ph-ii and ph-iii by shifting of empty hydrogen cylinders from ph-i, ph-ii and ph-iii to hydrogen plant etc. at sgtps, mpppgcl, birsinghpur.
Annual work contract for maintaining sufficient quantity of filled hydrogen cylinders in all units of ph-i, ph-ii and ph-iii by shifting of empty hydrogen cylinders from ph-i, ph-ii and ph-iii to hydrogen plant etc. at sgtps, mpppgcl, birsinghpur.
Read moreTggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Tggenco btps stage ii- cam division-reconditioning of clinker grinder rollers, roller shafts, shaft sleeves, shaft sleeve housings, fabrication of wear and guide plates, lantern rings of unit-4 bottom ash hopper clinker grinder assemblies during the overhaul for the year 2026-27
Read moreof your Industry type