Tender Details

Particulars Details
Title
Shifting Of 11 Kv Line For Improvement And Widening Of 100feet Road From Oerc Square To Left Parallel Road Via Kanyashram From 0.00km To 0.500km C.S.Pur Bhubaneswar.
Description
Shifting Of 11 Kv Line For Improvement And Widening Of 100feet Road From Oerc Square To Left Parallel Road Via Kanyashram From 0.00km To 0.500km C.S.Pur Bhubaneswar.
Organisation EIC-CIVIL | State Govt. and UT
Tender Id 2025_EICCL_112921_1
Reference
Number
eTCN-03 of 2025-26
Tender Fee 6000
EMD 21869
Tender Value
Place Bhubaneswar
Link https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=537955
Start Date April 29, 2025 20:55
End Date

05/05/2025 ( Expired 51 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Shifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor

Shifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.

Read more
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km

Read more
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).

Read more
Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line

Tower package tw02 for sarchu to zing-zingbar portion of 350 kv hvdc pang-kaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh (5 gw leh-kaithal transmission corridor)

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Construction of 33kv line from no 11 tarajan rob to jonai dss

Construction of 33kv line from no 11 tarajan rob to jonai dss apdcl via lakhi napali village under jonai esd 4.5 ckm along with construction of 33kv terminal bay at jonai dss of apdcl and construction of 33kv ug highway crossing at no 2 torajan

Read more
Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and

Survey and design of distribution network including providing, laying testing and commissioning of pipelines from rakkas tank via ventuary meter to 600 mm dia main pumping line area between sagartal to jalapur chauraha including jalalpur village and

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise