Tender Details
Particulars | Details |
---|---|
Title |
Dfr For Rrts Corridor Coimbatore Tirupur Erode Salem
|
Description |
Consultancy Assignment To Prepare A Detailed Feasibility Report (Dfr) For The Coimbatore Tirupur Erode Salem Regional Rapid Transit System (Rrts) Corridor
|
Organisation | Chennai Metro Rail Limited | Central Govt. Ministry/Department |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16000 |
EMD | 4 Lakh |
Tender Value | |
Place | Chennai |
Link |
AAAAAAAAAA Login to view |
Start Date | April 25, 2025 14:30 |
End Date |
15/05/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreCs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Cs for prep. of dpr for constr. of spur from amas darbhanga corridor of nh119d to bodhgaya rajgir vaishali and darbhanga in the state of bihar (2nd call)
Read moreConsultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Consultancy services for preparation of dpr for construction of buxar bhagalpur high speed corridor expressway in the state of bihar
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreCarrying out ridership study (traffic study) for mumbai -ahmedabad high speed rail corridor (about 508 kms long)
Carrying out ridership study (traffic study) for mumbai -ahmedabad high speed rail corridor (about 508 kms long)
Read moreCustom bid for services - support services to the resident geologist, amd camp idappadi, salem dist
Read more
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreConsultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway
Consultancy services for preparation of detailed project report for construction of 4/6 laned high speed corridor/expressway of bhavnagar bharuch in the state of gujarat
Read moreof your Industry type