Tender Details

Particulars Details
Title
Dfr For Rrts Corridor Coimbatore Tirupur Erode Salem
Description
Consultancy Assignment To Prepare A Detailed Feasibility Report (Dfr) For The Coimbatore Tirupur Erode Salem Regional Rapid Transit System (Rrts) Corridor
Organisation Chennai Metro Rail Limited | Central Govt. Ministry/Department
Tender Id 2025_CMRL_855658_1
Reference
Number
CMRL/CP/TDR-37-CS/2025
Tender Fee 16000
EMD 4 Lakh
Tender Value
Place Chennai
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=899597
Start Date April 25, 2025 14:30
End Date

15/05/2025 ( Expired 51 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rfp for developing, setting up, operating and maintaining commercial spaces through licensing at metro stations of priority corridor of agra metro rail project.

Rfp for developing, setting up, operating and maintaining commercial spaces through &#x0d licensing at metro stations of priority corridor of agra metro rail project.

Read more
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.

Read more
Knppd-08

Rfp for developing, setting up, operating and maintaining commercial spaces through &#x0d licensing at various metro stations of corridor-1 (iit kanpur-kanpur central) of uttar pradesh metro &#x0d rail corporation network at kanpur.

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road

Read more
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428

Read more
Selection and engagement of mine developer cum operator (mdo) for development and operation of pottangi bauxite mines along with overland conveyor corridor (olcc) and allied facilities

Selection and engagement of mine developer cum&#x0d operator (mdo) for development and operation of&#x0d pottangi bauxite mines along with overland conveyor&#x0d corridor (olcc) and allied facilities

Read more
Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Package m16 - design, manufacturing, supply, testing and commissioning of catenary maintenance vehicle for delhi ghaziabad-meerut namo bharat corridor.

Read more
Engagement of consultant for preparation of dfr for project for conversion of process co2 to sustainable aviation fuel at gail pata

Engagement of consultant for preparation of dfr for project for conversion of process co2 to sustainable aviation fuel at gail pata

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise