Tender Details
About Tender
🏗️ Barc Invites Bids For Office Upgradation And Conferencing Facility 📍 The Bhabha Atomic Research Centre (Barc), Under The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Comprehensive Renovation, Supply, And Installation Of An Office Upgrade Along With A Conferencing Facility At The Post Graduate Hostel Building In Anushaktinagar, Mumbai 400 094. 📅 Bid Submission Deadline: July 25, 2024, 6:00 Pm The Project Scope Includes The Fabrication, Supply, And Installation Of The Necessary Infrastructure To Enhance The Office Space And Conferencing Facilities. Interested Bidders Must Submit A Security Deposit Of Inr 3,48,478. Keywords: Barc, Office Upgradation, Conferencing Facility, Construction, Renovation, Bhabha Atomic Research Centre, Government Tender, MumbaiParticulars | Details |
---|---|
Title |
Barc/Css/21/2024 25 Fabrication, Supply And Installation Of Office Up Along With Conferencing Facility At Post Graduate Hostel Building, Anushaktinagar, Mumbai 400 094.
|
Description |
Fabrication, Supply And Installation Of Office Up Along With Conferencing Facility At Post Graduate Hostel Building, Anushaktinagar, Mumbai 400 094.
|
Organisation | Bhabha Atomic Research Centre | Central Govt. Ministry/Department |
Tender Id | 2024_BARC_814856_1 |
Reference Number |
BARC/CSS/21/2024-25 |
Tender Fee | 0 |
EMD | 3.48 Lakh |
Tender Value | |
Place | PG Hostel, Anushaktinagar, Mumbai 94 |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856353 |
Start Date | July 04, 2024 21:00 |
End Date |
25/07/2024 ( Expired 319 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26
Read moreSupply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.
Read moreSupply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project
Supply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project
Read moreSupply and installation of additional wi fi cctv camera along with 05 years amc at ia. site 4 sahibabad ghaziabad and m.g. road hapur.
Supply and installation of additional wi fi cctv camera along with 05 years amc at ia. site 4 sahibabad ghaziabad and m.g. road hapur.
Read moreSupply and installation of street light on newly constructed central verge by pwd at ia. masuri gulawathi road along with 01 year amc.
Supply and installation of street light on newly constructed central verge by pwd at ia. masuri gulawathi road along with 01 year amc.
Read moreConstruction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari
Construction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari
Read moreHiring of services for installation of indirect heater including fabrication and hooking up of flowline manifold with the heater laying of 100 mm nb flowlines and 50 mm nb fuel lines to the heaters at different locations of oils operational areas
Hiring of services for installation of indirect heater including fabrication and hooking up of flowline manifold with the heater laying of 100 mm nb flowlines and 50 mm nb fuel lines to the heaters at different locations of oils operational areas
Read moreConstruction of new double storied school building at baramoidan h.s. school khowai tripura under ridf xxx during the year 2024 25 building portion including internal water supply sanitary installation sewage and drainage works
Construction of new double storied school building at baramoidan h.s. school khowai tripura under ridf xxx during the year 2024 25 building portion including internal water supply sanitary installation sewage and drainage works
Read moreExternal and internal painting along with internal renovation of hop office at administrattive building dvc ktps koderma.
External and internal painting along with internal renovation of hop office at administrattive building dvc ktps koderma.
Read moreSetting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune
Setting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune
Read moreof your Industry type