Tender Details

About Tender

🏗️ Barc Invites Bids For Office Upgradation And Conferencing Facility 📍 The Bhabha Atomic Research Centre (Barc), Under The Central Government's Ministry/Department, Is Seeking Bids From Experienced Contractors For The Comprehensive Renovation, Supply, And Installation Of An Office Upgrade Along With A Conferencing Facility At The Post Graduate Hostel Building In Anushaktinagar, Mumbai 400 094. 📅 Bid Submission Deadline: July 25, 2024, 6:00 Pm The Project Scope Includes The Fabrication, Supply, And Installation Of The Necessary Infrastructure To Enhance The Office Space And Conferencing Facilities. Interested Bidders Must Submit A Security Deposit Of Inr 3,48,478. Keywords: Barc, Office Upgradation, Conferencing Facility, Construction, Renovation, Bhabha Atomic Research Centre, Government Tender, Mumbai
Particulars Details
Title
Barc/Css/21/2024 25 Fabrication, Supply And Installation Of Office Up Along With Conferencing Facility At Post Graduate Hostel Building, Anushaktinagar, Mumbai 400 094.
Description
Fabrication, Supply And Installation Of Office Up Along With Conferencing Facility At Post Graduate Hostel Building, Anushaktinagar, Mumbai 400 094.
Organisation Bhabha Atomic Research Centre | Central Govt. Ministry/Department
Tender Id 2024_BARC_814856_1
Reference
Number
BARC/CSS/21/2024-25
Tender Fee 0
EMD 3.48 Lakh
Tender Value
Place PG Hostel, Anushaktinagar, Mumbai 94
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=856353
Start Date July 04, 2024 21:00
End Date

25/07/2024 ( Expired 319 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Supply, installation, commissioning and maintenance of fibre-reinforced polymer (frp) made 20 seater luxury boat (ac) powered with yamaha/suzuki/tohatsu/honda obm, at dumboor lake, tripura along with amc contract during the year 2025-26

Read more
Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.

Supply, installation, commissioning and maintenance of parasail boat at dumbbor lake, tripura along with amc of 4 years during the year 2025-26.

Read more
Supply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project

Supply, fabrication and installation of ss equipment, structural members along with ss304l piping from building 401 to 503 of frfcf project

Read more
Supply and installation of additional wi fi cctv camera along with 05 years amc at ia. site 4 sahibabad ghaziabad and m.g. road hapur.

Supply and installation of additional wi fi cctv camera along with 05 years amc at ia. site 4 sahibabad ghaziabad and m.g. road hapur.

Read more
Supply and installation of street light on newly constructed central verge by pwd at ia. masuri gulawathi road along with 01 year amc.

Supply and installation of street light on newly constructed central verge by pwd at ia. masuri gulawathi road along with 01 year amc.

Read more
Construction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari

Construction of brick boundary wall and iron gate with rcc gate post and raising low site at dto and secy. rta office buildibng at charaideo under chararideo district territorial building division,sonari

Read more
Hiring of services for installation of indirect heater including fabrication and hooking up of flowline manifold with the heater laying of 100 mm nb flowlines and 50 mm nb fuel lines to the heaters at different locations of oils operational areas

Hiring of services for installation of indirect heater including fabrication and hooking up of flowline manifold with the heater laying of 100 mm nb flowlines and 50 mm nb fuel lines to the heaters at different locations of oils operational areas

Read more
Construction of new double storied school building at baramoidan h.s. school khowai tripura under ridf xxx during the year 2024 25 building portion including internal water supply sanitary installation sewage and drainage works

Construction of new double storied school building at baramoidan h.s. school khowai tripura under ridf xxx during the year 2024 25 building portion including internal water supply sanitary installation sewage and drainage works

Read more
External and internal painting along with internal renovation of hop office at administrattive building dvc ktps koderma.

External and internal painting along with internal renovation of hop office at administrattive building dvc ktps koderma.

Read more
Setting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune

Setting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise