Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Excavation Of Pukur And Renovation Of Pukur Pard At Gobinda Das Pond Side At Sautia
|
| Description |
Re Excavation Of Pukur And Renovation Of Pukur Pard At Gobinda Das Pond Side At Sautia
|
| Organisation | Zilla Parishad | State Govt. and UT |
| Tender Id | 2026_ZPHD_984678_1 |
|
Reference Number |
WB/PMZP/SAU/NIET-3(08)/2025-26 |
| Tender Fee | 250 |
| EMD | 1500 |
| Tender Value | - |
| Place | SAUTIA |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2402782 |
| Start Date | January 07, 2026 23:30 |
| End Date |
Expired
23/01/2026
Expired 261 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRe-surfacing on road from airport entry at rob to airport entry check post at shamshabad side of rgia shamshabad hyderabad.
Re-surfacing on road from airport entry at rob to airport entry check post at shamshabad side of rgia shamshabad hyderabad.
Read moreCleaning and removing of aquatic weeds, water hyacinth, duckweed, floating body from pond, khal, pwd road side barrow pit within tarakeswar municipality for pre sharabani mela 2026
Cleaning and removing of aquatic weeds, water hyacinth, duckweed, floating body from pond, khal, pwd road side barrow pit within tarakeswar municipality for pre sharabani mela 2026
Read moreArrangement for bathukamma festival at pragathi nagar lake (baby pond) immersion of durga matha idols for the year 2026-27 in bhagya nagar ward no. 244, allwyn colony circle-51, kpz, cmc (re-call)
Arrangement for bathukamma festival at pragathi nagar lake (baby pond) immersion of durga matha idols for the year 2026-27 in bhagya nagar ward no. 244, allwyn colony circle-51, kpz, cmc (re-call)
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read morePukur and pukur pard at pinaki mahapatra pond side at sautia
Pukur and pukur pard at pinaki mahapatra pond side at sautia
Read moreRe excavation pukur and renovation of pukur pard at dipak giri pond side at sarkisamath
Re excavation pukur and renovation of pukur pard at dipak giri pond side at sarkisamath
Read moreRe excavation of pond with renovation of pukur pard at ranjak pradhan pond side at paroi
Re excavation of pond with renovation of pukur pard at ranjak pradhan pond side at paroi
Read moreRe excavation of pond with renovation of pukur pard at arun kundu pond side at bangjhatia
Re excavation of pond with renovation of pukur pard at arun kundu pond side at bangjhatia
Read moreRe excavation of pond with renovation of pukur pard at pranata bhadra pond side at samsara 1
Re excavation of pond with renovation of pukur pard at pranata bhadra pond side at samsara 1
Read moreof your Industry type