Tender Details
Particulars | Details |
---|---|
Title |
Improvement To Adyal Dighori Bondgaon Navegaon Chichgad Ganutola Kakodi To State Border Road Sh 358 In Km 82/000 To 92/000 Taluka Deori Distt Gondia.
|
Description |
Improvement To Adyal Dighori Bondgaon Navegaon Chichgad Ganutola Kakodi To State Border Road Sh 358 In Km 82/000 To 92/000 Taluka Deori Distt Gondia.
|
Organisation | Public Works Region | State Govt. and UT |
Tender Id | 2024_PWR_1006483_1 |
Reference Number |
NGP/GON/DN.2/23 1st.call of Open 23/01 2023-2024 |
Tender Fee | 3540 |
EMD | 3.3 Lakh |
Tender Value | |
Place | Gondia |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1760363 |
Start Date | February 15, 2024 15:30 |
End Date |
29/02/2024 ( Expired 417 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement such as widening and strengthening of bhojpur-jamankira road from 0/000 km to 13/695 km in the district of sambalpur under state plan
Improvement such as widening and strengthening of bhojpur-jamankira road from 0/000 km to 13/695 km in the district of sambalpur under state plan
Read moreImprovement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Improvement construction of existing cl 5 road to nh intermediate lane specification with hard shoulder from existing km 00 000 to km 75 991 design km 00 000 to km 73 830 design length 73.830 km of nh 505 sumdo kaza gramphoo road in the state of hp.
Read moreUpgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made
Read moreConsrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Consrtuction of boxculvert at ch.84/200 on deori to korchi road section from km 80/025 to 124/965 on balaghat- gondia-amgaon-deori-korchi road nh 543 tahsil deori ,district gondia in the state of maharashtra
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd-4...
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 4)
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 5)
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534 (from ratia fatehabad road) (balance 33 kv material of shifting for rd- 5)
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534) (from ratia fatehabad road) (balance 33 kv material for rd- 3)
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad district (road id-5467-, 5467, 5546 and 5534) (from ratia fatehabad road) (balance 33 kv material for rd- 3)
Read moreImprovement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad distt. (road id-5467, 5467, 5546 and 5534) (from ratia fatehabad road) (pdg. shifting of electrical utility near ghaggar
Improvement of road from budhlada ratia fatehabad bhatu bhadra road upto rajasthan border (sh-21) km. 32.00 to 97.51 in fatehabad distt. (road id-5467, 5467, 5546 and 5534) (from ratia fatehabad road) (pdg. shifting of electrical utility near ghaggar
Read moreImprovement to adgaon road connecting to sh 51 road odr 169 in km 1 500 to 3 00 tq pusad dist yavatmal
Improvement to adgaon road connecting to sh 51 road odr 169 in km 1 500 to 3 00 tq pusad dist yavatmal
Read moreof your Industry type