Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Work Of Meerut Pauri (Nh 34) Of Km 55 To Meerapur Bus Stand Sarai Bhumma Naher Pul To Km 15 Of Khedi Kuresh Ghatayan Road
|
Description |
Widening And Strengthening Work Of Meerut Pauri (Nh 34) Of Km 55 To Meerapur Bus Stand Sarai Bhumma Naher Pul To Km 15 Of Khedi Kuresh Ghatayan Road
|
Organisation | Cheif Engineer Meerut Zone PWD Meerut | State Govt. and UT |
Tender Id | 2024_CEMRT_951695_1 |
Reference Number |
6468/24MS-S/2024 Date 22-08-2024 |
Tender Fee | 2714 |
EMD | 21.28 Lakh |
Tender Value | |
Place | muzaffarnagar |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1651884 |
Start Date | September 03, 2024 21:30 |
End Date |
10/09/2024 ( Expired 253 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreWidening and strengthening work on ajmer beawar udaipur road km 56-100 to 58-100 udaipur road chungi naka to chang gate beawar
Widening and strengthening work on ajmer beawar udaipur road km 56-100 to 58-100 udaipur road chungi naka to chang gate beawar
Read moreWidening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreof your Industry type