Tender Details
Particulars | Details |
---|---|
Title |
Sc Services During On M Stage Of 4 Laning Of Deoli Kota Section Of New Nh 52 And 2 Laning With Paved Shoulder Of Gulabpura Uniara Section Of Nh 148 D Total Length 286.497 In The State Of Rajasthan
|
Description |
Sc Services During On M Stage Of 4 Laning Of Deoli Kota Section Of New Nh 52 And 2 Laning With Paved Shoulder Of Gulabpura Uniara Section Of Nh 148 D Total Length 286.497 In The State Of Rajasthan
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id | 2024_NHAI_216447_1 |
Reference Number |
NHAI/RAJDIV-20011/ 25/2024-NHAI- RO Jaipur |
Tender Fee | 5000 |
EMD | 0 |
Tender Value | |
Place | NHAI RO JAIPUR |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=239611 |
Start Date | November 26, 2024 21:40 |
End Date |
15/01/2025 ( Expired 122 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services for 4 laning of rajapalayam to shenkottai section of nh-744 in tamil nadu on ham (project length-68.3km)
Independent engineer services for 4 laning of rajapalayam to shenkottai section of nh-744 in tamil nadu on ham (project length-68.3km)
Read moreIndependent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Independent engineer services for 4 laning of marakkanam-puducherry section of nh-332a in tamil nadu on ham (project length-46 km) (mahabalipuram-puducherry package-iii)
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreConstruction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham
Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham
Read moreIe services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Ie services for supervision construction of new 4-lane with paved shoulder from dareota village to kalar bala village of nh-205 (km.33.175 to km 41.000 length 7.825 km) including twin tube tunnel package-iib in himachal pradesh under nh (o) on ham
Read moreof your Industry type