Tender Details
Particulars | Details |
---|---|
Title |
Construction Of New Mandi Prangan Lalkhedi Approach Road Length 0.95 Km Under Sub Divisin Kannod With Electric Pole Shifting And Electrification Work Under Kisan Sadak Nidhi
|
Description |
Construction Of New Mandi Prangan Lalkhedi Approach Road Length 0.95 Km Under Sub Divisin Kannod With Electric Pole Shifting And Electrification Work Under Kisan Sadak Nidhi
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_PWDRB_295400_1 |
Reference Number |
26/SAC/2023-24/3199/DEWAS/DATE 26.07.2023 |
Tender Fee | 10000 |
EMD | 90090 |
Tender Value | |
Place | CHIEF ENGINEER, PWD UJJAIN ZONE UJJAIN |
Link | https://mptenders.gov.in |
Start Date | July 31, 2023 20:30 |
End Date |
11/08/2023 ( Expired 648 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreSub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Sub soil investigation, design and construction of 50 mtr span psc box girder bridge on kawlchaw nallah at km 7.980 on k-p-t road on open foundation under 71 rcc/ 24 brtf/ project pushpak in mizoram state(3rd call)
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreProviding pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Providing pole shifting in construction of basoda ring road (by pass) from new mandi bereth road to mewli via syawada ganj, rajoda , chourawara pachama mahagour rc length 23.80 km. (phase -2) ganjbasoda dist vidisha
Read morePr of road from pecharthal kanchanpur road to pecharthal electric office road via dewan para during the year 2025 2026 total length 0 400 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 400 km
Pr of road from pecharthal kanchanpur road to pecharthal electric office road via dewan para during the year 2025 2026 total length 0 400 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 400 km
Read moreof your Industry type