Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Const Of Steel Foot Bridge Near Eid Gah On Nallah Balharma
|
| Description |
Const Of Steel Foot Bridge Near Eid Gah On Nallah Balharma
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_RDPR_220615_6 |
|
Reference Number |
NIT No 100 of 2023-24 PRI HYHAMA |
| Tender Fee | 500 |
| EMD | 19700 |
| Tender Value | - |
| Place | Ex.Engineer REW Kupwara |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | July 10, 2023 16:30 |
| End Date |
Expired
20/07/2023
Expired 1146 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Construction of double lane steel truss girder bridge 3 x 30 m span on road nhia km 55th to surara, package no jk07-wb-01 at rd 5.575 to 5.675
Read moreConstruction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.
Construction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.
Read moreRepair work of 800mm dia bws pipe line in gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe , korlahalli 2nd bridge and dhoni cross ,hammagi jack well pump house ,adavisambapur bharath petrol bunk , lic office near ring road papanasi kalmeshwar temple cross at gbcmc limits.
Repair work of 800mm dia bws pipe line in 1) gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe 3) near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe 8) korlahalli 2nd bridge and dhoni cross 9) hammagi jack well pump house 10) adavisambapur bharath petrol bunk , lic office near ring road 11) papanasi kalmeshwar temple cross at gbcmc limits.
Read moreConstruction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreFoot steps with slab at eid gah nallah pyt udhyanpur block dali udhyanpur (ddc grant)
Foot steps with slab at eid gah nallah pyt udhyanpur block dali udhyanpur (ddc grant)
Read moreof your Industry type