Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of Differential Pressure Regulating Valve B For 210 Mw Kwu Turbo Generator Seal Oil System (Ring Type) In Unit Iv And V
|
| Description |
Supply Of Differential Pressure Regulating Valve B For 210 Mw Kwu Turbo Generator Seal Oil System (Ring Type) In Unit Iv And V
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_393418_1 |
|
Reference Number |
CE/TTPS/3371-S |
| Tender Fee | 0 |
| EMD | 25400 |
| Tender Value | - |
| Place | SEPATTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | November 27, 2023 23:30 |
| End Date |
Expired
18/01/2024
Expired 1004 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreTurbo generator (tg) seal oil cooling system capacity: 200 mw bhel make tg set
Turbo generator (tg) seal oil cooling system capacity: 200 mw bhel make tg set
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit repairing of hydraulic speed governor for 210 mw kwu turbine of 3x210 mw atps anpara service provider
Read moreWork contract for rebabitting of journal bearings (bearing no5) of generator of 210 mw atps chachai
Work contract for rebabitting of journal bearings (bearing no5) of generator of 210 mw atps chachai
Read moreSupply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Supply of materials for“ turbine supervisory & vibration monitoring system for 3 x 210 mw, kwu turbi,installation, testing & commissioning of“ turbine supervisory & vibration monitoring system for 3 x
Read moreProcurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreTggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Tggenco-ytps-supply of seal ring segments for hp1103 bowl mills required for boiler-iii and iv/ytps/stg-ii.
Read moreGasket cyl head turbo,piston,piston ring std i,piston oil ring,liner assy,gasket exaust manifold,gasket inlet manifold,oil seal kit 49101,hyd hose loader cyl,hyd hose bucket cyl,mcb 40 amp
Gasket cyl head turbo,piston,piston ring std i,piston oil ring,liner assy,gasket exaust manifold,gasket inlet manifold,oil seal kit 49101,hyd hose loader cyl,hyd hose bucket cyl,mcb 40 amp
Read moreGasket,gasket,gasket,gasket,collar,collar,fuse link vp2b iv5 10a 250v,fuse link vpi iv 2a 250v,cord,gasket,packing ring,ring packing,ring packing,ring,protective hood,packing ring 48x55mm,gasket,packing,ring packing,jacket mantlet cover,gasket,buffer,gasket,ring,seal and spring set consisting of 2 items,gasket,packing ring
Gasket,gasket,gasket,gasket,collar,collar,fuse link vp2b iv5 10a 250v,fuse link vpi iv 2a 250v,cord,gasket,packing ring,ring packing,ring packing,ring,protective hood,packing ring 48x55mm,gasket,packing,ring packing,jacket mantlet cover,gasket,buffer,gasket,ring,seal and spring set consisting of 2 items,gasket,packing ring
Read moreOperation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years
Operation and maintenance of other machines and plants - maintenance of coal mills and its auxiliaries of units i to iv 210 mw each at mtps dvc for a period of two years
Read moreof your Industry type