Tender Details

Particulars Details
Title
Coat With Bush Shirt Collar Terry Cotton Khaki With Four Pockets Two At Breast Level And Two Bigger
Description
Organisation COAL INDIA LIMITED | Ministry of Coal
Tender Id GEM/2025/B/5971519
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date February 19, 2025 19:13
End Date

01/03/2025 ( Expired 80 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Baidyanath Sahoo
Address: BAIDYANATH SAHOO,[email protected],OFFICE OF THE GENERAL MANAGER, BHARATPUR AREA, AT PO N.S.Nagar, Bharatpur, Via Talcher, Dist Angul 759148,ANGUL,ODISHA,759148,India,06760-296222-
Ministry: Ministry Of Coal
Department: Coal India Limited
Organisation: Mahanadi Coalfields Limited
Office Address: Mcl Sambalpur Odisha
Similar Tenders
Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost

Rehabilitation and upgradation of jamkhed to sautada section of nh 548d from design ch km 195.375 to ch km 208.774 to two lane with paved shoulder four lane configuration with rigid pavement in the state of maharashtra on epc mode under risk and cost

Read more
81797 addn / altn to oh power supply, transmission line with ug power cables and allied items at followers qtrs, stn hq and other small pockets at nda under ge (nda) khadakwasla

81797 addn / altn to oh power supply, transmission line with ug power cables and allied items at followers qtrs, stn hq and other small pockets at nda under ge (nda) khadakwasla

Read more
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta

Read more
Supply & installation of two electric furnaces with spares and comprehensive amc for 1 year at sru bhilai and sru ranchi road (repair, maintenance, and installation of plant/systems/ equipments (version 2) - manufacturing unit)

Supply & installation of two electric furnaces with spares and comprehensive amc for 1 year at sru bhilai and sru ranchi road (repair, maintenance, and installation of plant/systems/ equipments (version 2) - manufacturing unit)

Read more
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.

Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.

Read more
Spl repair mes instln conversion of ht two three and four pole structure into outdoor ht vcbs and repair of rusted lt panels street lights poles timer panels and other connected items

Spl repair mes instln conversion of ht two three and four pole structure into outdoor ht vcbs and repair of rusted lt panels street lights poles timer panels and other connected items at laaipuli

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota

Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota

Read more
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis

Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis

Read more
Paintingwork at rangarajapuram two wheelersubway electrical work d134 zx and dismantling damaged wearing coat laying of steel fiber reinforced paver blocks in the riding surface electrical works duraiswamy subway in d133 zone x

Paintingwork at rangarajapuram two wheelersubway electrical work d134 zx and dismantling damaged wearing coat laying of steel fiber reinforced paver blocks in &amp#x0d the riding surface electrical works duraiswamy subway in d133 zone x

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise