Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Coat With Bush Shirt Collar Terry Cotton Khaki With Four Pockets Two At Breast Level And Two Bigger
|
Description |
|
Organisation | COAL INDIA LIMITED | Ministry of Coal |
Tender Id | GEM/2025/B/5971519 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | February 19, 2025 19:13 |
End Date |
01/03/2025 ( Expired 114 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of two storied inspection bungalow with provision of vertical extension of one additional floor (3 story) and allied work at bolpur 132 kv s/stn, under birbhum area office
Construction of two storied inspection bungalow with provision of vertical extension of one additional floor (3 story) and allied work at bolpur 132 kv s/stn, under birbhum area office
Read moreRehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Rehabilitation and upgradation of nehru nagar to kothagudem section to two lane four lane with paved shoulders from km 178.500 to km 230.580 of nh 930p in the state of telangana on epc basis
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read morePerformance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreProvn of water level indicator with connected works and exhaust fans against ber at cgra meenambakkam and various locations under ge (i) cg chennai.
Provn of water level indicator with connected works and exhaust fans against ber at cgra meenambakkam and various locations under ge (i) cg chennai.
Read moreConnecting tie rod with two nuts,bush for screw conveyor assy,collar for screw conveyor assy,fixed
Read more
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Surface cleaning with single coat of red oxide and alum. paint having weight of towers 401.315mt (without half crossarm) and black bituminous painting work up to the height of 1 m. of stubs at 164 nos loc. of 03 nos 132kv ehv lines under tlm satna
Read moreDeployment of two manpower for it facility management at coal mines, railway siding and coal mines guest house with amc of it assets and supply of passive data network for three years
Deployment of two manpower for it facility management at coal mines, railway siding and coal mines guest house with amc of it assets and supply of passive data network for three years
Read moreProviding consultancy and other allied services with all working drawings (digital layout plan, /boq,structural , architectural design, ) and conducting of all required soil investigations for construction of two numbers of entry points at sampora ne
Providing consultancy and other allied services with all working drawings (digital layout plan, /boq,structural , architectural design, ) and conducting of all required soil investigations for construction of two numbers of entry points at sampora ne
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreof your Industry type