Tender Details
Particulars | Details |
---|---|
Title |
Rfp For Survey Design Supply Erection Testing Commissioning And Comprehensive O And M For 25 Years Of 15 Mw Grid Connected Rooftop Solar Photovoltaic Power Projects On State Government Buildings/State Government Undertaking Building In Rajasthan
|
Description |
Rfp For Survey Design Supply Erection Testing Commissioning And Comprehensive O And M For 25 Years Of 15 Mw Grid Connected Rooftop Solar Photovoltaic Power Projects On State Government Buildings/State Government Undertaking Building In Rajasthan
|
Organisation | Rajasthan Electronics and Instruments Limited | Central Govt. Ministry/Department |
Tender Id | 2025_REIL_842661_1 |
Reference Number |
REIL/RE/24-25/14 |
Tender Fee | 5000 |
EMD | 8.7 Lakh |
Tender Value | |
Place | REIL JAIPUR |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=885761 |
Start Date | January 03, 2025 23:05 |
End Date |
03/02/2025 ( Expired 99 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreEpc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Epc contractor for design, engineering, procurement, supply, construction, commissioning on turnkey basis and comprehensive operation and maintenance for 10 (5 plus 5) years of 50 mw grid-connected solar photovoltaic power plants at ttps, lalpania
Read more(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2360 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the western region
(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2360 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the western region
Read moreRfs of solar rooftop power developers for setting up of cumulative capacity of 2954 kw grid connected rooftop solar pv power projects without battery storage on union government buildings in the eastern region states
Rfs of solar rooftop power developers for setting up of cumulative capacity of 2954 kw grid connected rooftop solar pv power projects without battery storage on union government buildings in the eastern region states
Read more(rfs) of solar rooftop power developers for setting up of cumulative capacity of 5140 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the southern region resco mode under pmsgmby
(rfs) of solar rooftop power developers for setting up of cumulative capacity of 5140 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the southern region resco mode under pmsgmby
Read more(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2496 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the northern region resco mode under pmsgmby
(rfs) of solar rooftop power developers for setting up of cumulative capacity of 2496 kw grid connected rooftop solar pv power projects (without battery storage) on union government buildings in the northern region resco mode under pmsgmby
Read moreSurvey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Survey design fabrication supply installation testing commissioning of on-grid srt project with net meter and rms of 355 kw at various 24 govt/ semi govt offices buildings in satara district of maharashtra with cmc for 5 years
Read moreDesign supply erection testing commissioning of 50 kwp on grid solar ground mounted power panel nearby switchyard south _ west side fencing at mtps i under turnkey basis _epc contract_1 set
Design supply erection testing commissioning of 50 kwp on grid solar ground mounted power panel nearby switchyard south _ west side fencing at mtps i under turnkey basis _epc contract_1 set
Read moreDesign, engineering, procurement, supply, installation, testing and commissioning of cumulative capacity of 5000 kwp(dc) on-grid roof top solar plants on the colony residential buildings and office buildings at different areas of sccl with 10 years comprehensive o and m contract.
Design, engineering, procurement, supply, installation, testing and commissioning of cumulative capacity of 5000 kwp(dc) on-grid roof top solar plants on the colony residential buildings and office buildings at different areas of sccl with 10 years comprehensive o and m contract.
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreof your Industry type