Tender Details
Particulars | Details |
---|---|
Title |
Work Of Pipe Line Along With Junction Box From Existing Air Compressors To Various Washing Line / Sick Line Of Cnb &Amp Pryj Depot.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72677186 |
Reference Number |
NCR-M-PRYJ-PPL-11-23 |
Tender Fee | 0 |
EMD | 85100 |
Tender Value | |
Place | Allahabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72677186/viewNitPdf_4431267.pdf |
Start Date | December 21, 2023 20:04 |
End Date |
15/01/2024 ( Expired 485 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Strengthening of existing stretch from km 101/880 to 105/300 of nh-167bg inkavali town along with one-time improvement of bypassed stretch of jaladanki town from km 91/770 to 94/300 on epc mode in spsr nellore district in the state of andhra pradesh
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreConstruction of distribution system for 5177.98 ha. of cca including command area development (cad) of salandi left main canal from rd 59.970 km to 60.304 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 5177.98 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 59.970 km to 60.304 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreYearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Yearly contract for removal of lead shots from firing butts and topping of existing sand with fresh sand and minor repair work in various butts of range complex, including pistol range under rfi control and 550m sniper tunnel of sqae.
Read moreWork of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Work of prion measures for seepages in tunnel, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 new nh-66 to four lanes with paved shoulder from existing km. 148.000 to 161.600 including
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreConstruction of distribution system for 4924.04 ha. of cca including command area development (cad) of salandi left main canal from rd 49.810 km to 59.970 km through under ground pipe line irrigation system (gravity flow) of anandapur barrage project
Construction of distribution system&#x0d for 4924.04 ha. of cca including&#x0d command area development (cad)&#x0d of salandi left main canal from rd&#x0d 49.810 km to 59.970 km through&#x0d under ground pipe line irrigation&#x0d system (gravity flow) of abp
Read moreLaying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Laying of di pipe from bhainsa to wtp in connection to the work augmentation of water supply system along with ancillary work for patnagarh town under amrut 2.0
Read moreErection of 9 km 33 kv sc line with acsr dog conductor from loharki feeder to 33 kv proposed gss govindsinghpura and const. of 3.15 mva gss at govindisnghpura with 5.9 km 11 kv ic work under aen onm jdvvnl nachana on lrc2022
Erection of 9 km 33 kv sc line with acsr dog conductor from loharki feeder to 33 kv proposed gss govindsinghpura and const. of 3.15 mva gss at govindisnghpura with 5.9 km 11 kv ic work under aen onm jdvvnl nachana on lrc2022
Read moreTiruppur corporation_retro fitting of existing water supply pipe line from avinashi to mettupalayam road (from 0/0 13/0 km) due to four laning works by highways department, avinashi sub division under coimbatore division.
Retro fitting of existing water supply pipe line from avinashi to mettupalayam road (from 0/0 13/0 km) due to four laning works by highways department, avinashi sub division under coimbatore division.
Read moreof your Industry type