Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Erection Dismantling Of 440 V Mine Lt O H Line Conductor, Poles And Accessories For Maintenance Of 440 Over Head Line Of Parej Colony At Peocp Under Hzb Area
|
| Description |
Erection Dismantling Of 440 V Mine Lt O H Line Conductor, Poles And Accessories For Maintenance Of 440 Over Head Line Of Parej Colony At Peocp Under Hzb Area
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_289177_1 |
|
Reference Number |
PO/PEOCP/EnM/Tender/23-24/ 09 |
| Tender Fee | - |
| EMD | 2400 |
| Tender Value | - |
| Place | PEOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 20, 2023 20:30 |
| End Date |
Expired
30/09/2023
Expired 1111 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Providing lightning arrestor, earthing ,cradle guard and erection of poles, etc and dismantling of poles, conductor,etc near mahalaxmi camp sub station and its 3.3kv ht line under ashok west ocp, piparwar area.
Read moreCustom bid for services - erection and dismantling works at saraipali ocm for 365 days 440v and or 220v lt line
Custom bid for services - erection and dismantling works at saraipali ocm for 365 days 440v and or 220v lt line
Read moreDismantling of ascr panther conductor from dead end gantry to tower no. 05 of kachhwa-ii line, construction of 01no. c 0 type tower, erection and stringing of htls panther conductor
Dismantling of ascr panther conductor from dead end gantry to tower no. 05 of kachhwa-ii line, construction of 01no. c 0 type tower, erection and stringing of htls panther conductor
Read moreDay-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Day-to-day work of dismantling, erection, and maintenance of 11 kv, 3.3 kv, and lt overhead lines, including dismantling and erection of light fittings mounted on poles, structures, and high mast towers, etc., at the surface area of ananta ocp, ja.
Read moreErection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Erection of lt and ht metallic electrical poles with overhead lines and other required ohl structures at different locations along with dismantling of lt and ht poles, ohl and other ohl structures damaged during thundering, tree felling, heavy rains
Read moreDismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Dismantling and erection cum re arrangement of the 10 inch dia m.s. pipes along with other miscellaneous jobs, needed for shifting of the 2500 g.p.m. kirloskar make pump, in operation at the deep mine zone at r.o.c.p. mine under rajmahal area
Read moreShifting/diversion and modification of electrical utilities and transmission line(s) of 11kv and above infringing the alignment,comprising dismantling of existing towers/poles,conductors and allied electrical installations,supply, erection,stringing,
(continue ) testing and commissioning of new towers/poles with allied foundation and other allied works etc. schedule-a- b/w aligarh jn.stn and harduaganj stn.schedule-b- shifting of ncr transmission line between aligarh jn.stn and daud khan stn
Read moreRepairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Repairing rectification of damage of lt ht overhead line dismantling shifting and erection of conductor of overhead line in different places in adarsh nagar colony after comes heavy storm under ta eandm kusmunda area
Read more(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
(a)day to day erection, extension, diversion and dismantling of 220v/440 v oh line at 06 no, departmental patch and weighbridge for providing lighting power for proper lighting for operation of shovel for a period of 365 days or till exhaustion of qu
Read more(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting
Read moreof your Industry type