Tender Details
Particulars | Details |
---|---|
Title |
Rehabilitation And Improvements Of Lower Bhavani (Bhavanisagar) Dam In Sathyamangalam Taluk Of Erode District Under Drip Ii (Hydro Mechanical Works)
|
Description |
Rehabilitation And Improvements Of Lower Bhavani (Bhavanisagar) Dam In Sathyamangalam Taluk Of Erode District Under Drip Ii (Hydro Mechanical Works)
|
Organisation | Water Resources Department | State Govt. and UT |
Tender Id | 2025_WRD_516764_1 |
Reference Number |
NIT.No.4 /2024-25/BBC/ Erode/Date.30.12.2024 |
Tender Fee | 0 |
EMD | 3.9 Lakh |
Tender Value | |
Place | Bhavanisagar |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=614914 |
Start Date | January 09, 2025 14:30 |
End Date |
20/02/2025 ( Expired 82 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) category- ii (100-200 lacs)- empanelment for ii nd year
Perpetual empanelment of contractors for execution of various types and nature of engineering works under tamil nadu state office under category-i (0-100 lacs) and category- ii (100-200 lacs)- empanelment for ii nd year
Read morePublic tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Public tender for perpetual empanelment of contractors for execution of various types and nature of engineering works under maharashtra state office under category-i 0-100 lakhs and category- ii 100-200 lakhs
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreRfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Rfp for protective treatment works of landslide zone in varandh ghat section in km 90.180 to 90.260 and km 94.150 to 96.600 on nh-965 dd in raigad district in the state of maharashtra
Read moreRehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Read moreConstruction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Construction of check dam across marudhaiyar river at varanavasi village in ariyalur taluk and district
Read morePackage-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Package-i civil and hydro-mechanical works of di tunnels pertaining to tato-ii hydro electric project (700 mw), arunachal pradesh
Read moreRepair and rehabilitation of 05 nos. bridges
Repair and rehabilitation of 05 nos. bridges of nh-512 under n.h. division no. vii, p.w. roads directorate in the district of dakshin dinajpur, west bengal during the year 2024-25 on sbd mode. job no. nh-512/wb/2024-25/565
Read moreBalance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreImplementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Read moreof your Industry type