Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Masonry Maintenance, Miscellaneous Works, Disposal Of Garbage Of Various Labs And Buildings Inside Igcar Complex During The Year 2026 2027.
|
| Description |
Masonry Maintenance, Miscellaneous Works, Disposal Of Garbage Of Various Labs And Buildings Inside Igcar Complex During The Year 2026 2027.
|
| Organisation | Indira Gandhi Centre for Atomic Research | Central Govt. Ministry/Department |
| Tender Id | 2025_IGCAR_876084_1 |
|
Reference Number |
CEG/IGC/2122/2025 |
| Tender Fee | 0 |
| EMD | 2.8 Lakh |
| Tender Value | - |
| Place | KALPAKKAM |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=920906 |
| Start Date | September 05, 2025 14:30 |
| End Date |
Expired
17/09/2025
Expired 392 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Miscellaneous civil repairs and maintenance works in operational area, operational buildings and non-operational area, city side area at jalgaon airport 2027-28
Miscellaneous civil repairs and maintenance works in operational area, operational buildings and non-operational area, city side area at jalgaon airport during the year 2027-28
Read moreCustom bid for services - comprehensive annual maintenance contract of 14 nos of m/s omega make lifts at various buildings inside barc campus for three (3) years(2026-2027, 2027-2028 and 2028-2029), north site, barc, mumbai-400085
Custom bid for services - comprehensive annual maintenance contract of 14 nos of m/s omega make lifts at various buildings inside barc campus for three (3) years(2026-2027, 2027-2028 and 2028-2029), north site, barc, mumbai-400085
Read moreFacility management services - lumpsum based - comprehensive non- mechanized cleaning and housekeeping of drm office (administrative complex) jat for 03 year(36 months) housekeeping, collection and disposal of garbage consumables to be provided by ..
Facility management services - lumpsum based - comprehensive non- mechanized cleaning and housekeeping of drm office (administrative complex) jat for 03 year(36 months) housekeeping, collection and disposal of garbage consumables to be provided by ..
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreMasonry maintenance, miscellaneous works, disposal of garbage of various labs and buildings inside igcar complex during the year 2025 to 2026.
Masonry maintenance, miscellaneous works, disposal of garbage of various labs and buildings inside igcar complex during the year 2025 to 2026.
Read moreMasonry maintenance, collection and disposal of garbage/ refuse and miscellaneous works in fbtr complex at igcar, kalpakkam during the year 2024-2025.
Masonry maintenance, collection and disposal of garbage/ refuse and miscellaneous works in fbtr complex at igcar, kalpakkam during the year 2024-2025.
Read moreMasonry maintenance, collection and disposal of garbage / refuse and other miscellaneous works in fbtr complex at igcar, kalpakkam during the year 2025-2026.
Masonry maintenance, collection and disposal of garbage / refuse and other miscellaneous works in fbtr complex at igcar, kalpakkam during the year 2025-2026.
Read moreImprovement of light fixtures and associated works in various buildings and labs at igcar, kalpakkam.
Improvement of light fixtures and associated works in various buildings and labs at igcar, kalpakkam.
Read moreMaintenance of storm water drain and drain mouth inside igcar, kalpakkam during the year 2026-2027.
Maintenance of storm water drain and drain mouth inside igcar, kalpakkam during the year 2026-2027.
Read moreof your Industry type