Tender Details

Particulars Details
Title
Curtain Grouting Work In Gallery Of Bansujara Dam Including 60 Months For Maintenance Period.
Description
Curtain Grouting Work In Gallery Of Bansujara Dam Including 60 Months For Maintenance Period.
Organisation Government of Madhya Pradesh
Tender Id 2023_WRD_304518_1
Reference
Number
1022/2023-24/Einc/Etendering/ dt.05-09-2023
Tender Fee 50000
EMD 14.55 Lakh
Tender Value -
Place Bhopal
Link
View Original Tender Notice

https://mptenders.gov.in

Start Date September 13, 2023 16:00
End Date
Expired 23/10/2023

Expired 1083 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply and installation of new standby 20hp dewatering pumps in foundation gallery(+250ft) at nagarjuna sagar dam, nalgonda district, telangana

Supply and installation of new standby 20hp dewatering pumps in foundation gallery(+250ft) at nagarjuna sagar dam, nalgonda district, telangana

Read more
Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)

Laying of cc road from h.no: 20-005 to 22-017 at girinagar under giri nagar ward-283, chintal circle-54 ,qbz,cmc (item no.2) (completion period 1.5 months)

Read more
Engaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months

Engaging of security guards (12 nos) at bum rukn ud dowla lake in shastripuram, attapur, in rajendranagar zone, ghmc for the year 2026-27 for a period of 12 months

Read more
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Read more
Hiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.

Hiring of 2 nos. of 750kva, 3-phase, 440v diesel generator sets for a period of 12 months with 600hrs/month/generator for use at naini coal mine of sccl, chhendipada, odisha state.

Read more
Extension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)

Extension of services of the four (04) security guards deployed in parks for a period of seven (07) months, from september, 2026 to march, 2027 in the office of the deputy director,serilingampally zone,cmc (item-02)(2nd call)

Read more
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Curtain grouting work in gallary of bansujara dam with 60 months for maintenance period.

Curtain grouting work in gallary of bansujara dam with 60 months for maintenance period.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise