Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Lift Irrigation Scheme Beet Area Phase Ii In Tehsil Haroli District Una (Hp).
|
Description |
Construction Of Lift Irrigation Scheme Beet Area Phase Ii In Tehsil Haroli District Una (Hp).
|
Organisation | HP Irrigation and Public Health | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 10000 |
EMD | 71.68 Lakh |
Tender Value | |
Place | C/O LIS Beet Area Phase-II in Tehsil Distt Una HP |
Link |
AAAAAAAAAA Login to view |
Start Date | July 07, 2025 22:30 |
End Date |
25/07/2025 ( 16 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Construction of new major bridge over purna river near viraval between km 363/360 to km 364/360 of nh 64 in navsari district in the state of gujarat on engineering procurement and construction epc mode
Read moreConstruction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii blocks of purba medinipur- wbdwsip/dww/em/03/2025-26
Construction of overhead tanks, water distribution network and metering for safe drinking water with house to house connections covering 36 mouzas in nandigram-i and ii block of purba medinipur district with 2 yrs. o and m wbdwsip/dww/em/03/2025-26
Read moreConstruction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Construction of proposed r.o.b. and its approaches in replacement of existing level crossing no.21x at km ch.107/500 of nh 64 district anand in the state of gujarat
Read moreConstruction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Construction of 4 lane access controlled highway from vakalpudi light house to annavaram (on nh16) section of nh516f from km. 0.000 to km. 40.621 on ham under bharatmala pariyojana phase i in the state of andhra pradesh
Read moreConstruction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Construction of tech infra and allied services at bikaner and mffr under ge p bikaner phase ii of ii phases on epc mode
Read moreConstruction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode
Construction of road kibithu kundao from km 0.000 to km 52.000
 design length 0.000 to 19.557 kms green field alignment to nhsl
 specifications under project udayak in anjaw district of arunachal
 pradesh state on epc mode
Read moreConstruction of road dahlod datwas to seepura, kurthal to lunera ashram, badi dhani, lunera to goverdhanpura, seepura to kerlidham, shriram to kerli dham, churad to jetpura in district tonk
Construction of road dahlod datwas to seepura, kurthal to lunera ashram, badi dhani, lunera to goverdhanpura, seepura to kerlidham, shriram to kerli dham, churad to jetpura in district tonk
Read moreBeautification work c.m. infrasture scheme 4 phase in urban area shujalpur nagar
Beautification work c.m. infrasture scheme 4 phase in urban area shujalpur nagar
Read moreConstruction of r.c.c. drain under c.m. infrasture scheme 4 phase in chity mandi road shujalpur nagar
Construction of r.c.c. drain under c.m. infrasture scheme 4 phase in chity mandi road shujalpur nagar
Read moreConstruction of boundary wall, pathway in ariha enclave garden situate at near scheme no. 103 under zone no. 13 ward no. 78.
Construction of boundary wall, pathway in ariha enclave garden situate at near scheme no. 103 under zone no. 13 ward no. 78.
Read moreof your Industry type