Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Rcc Bridge Over Ratacherra And Juricherra On The Road From Mdf Road To Emrapassa At Ch 0 Point 30 Km And At Ch 3 Point 00 Km During The Year 2023 24 Sh Strengthening Of Approach Road Of Rcc Bridges Two 2 Nos By Wbm Carpetting Etc
|
Description |
Construction Of Rcc Bridge Over Ratacherra And Juricherra On The Road From Mdf Road To Emrapassa At Ch 0 Point 30 Km And At Ch 3 Point 00 Km During The Year 2023 24 Sh Strengthening Of Approach Road Of Rcc Bridges Two 2 Nos By Wbm Carpetting Etc
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_39145_1 |
Reference Number |
32/EE/KD/2023-24 |
Tender Fee | 1000 |
EMD | 48273 |
Tender Value | |
Place | The Executive Engineer Kumarghat Division PWD R an |
Link | https://tripuratenders.gov.in |
Start Date | June 08, 2023 17:45 |
End Date |
28/06/2023 ( Expired 663 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Fdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Fdr/mtc. of road from dalak gamako road to paschim malbassa a.w.c(l-1.450 km) under pwd(randb) amarpur sub-division -i during the year 2024-25/sh- metalling, re-carpetting, sand seal coating, retaining wall, cd etc.
Read moreImprovement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Improvement of amarpur rd block road from gate no-1 to gate no-2 (l-0.450 km) under amarpur rd block during the year 2025-26.sh- widening, gsb,wbm-ii, wbm-iii, pmc(paver machine) and road marking and furniture etc
Read moreImprovement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Improvement and widening of approach road to hapjan ocs from rcc bridge over tingrai river to tingrai reserve near forest tiniali indirect heater with earth filling for side berm, laying culvert with head wall, gsb, wbm and sdbc work including supply of all plant and materials except cement
Read moreMaintenance of road from nh44a to santi mension institute under jmupui hill sub-division during the year 2025-26 sh- earth filling, gsb, wbm-2, wbm-3, pot holes repair, tack coat, carpeting, seal coating, bamboo palasiding etc.(l 0.125 km)
Maintenance of road from nh44a to santi mension institute under jmupui hill sub-division during the year 2025-26 sh- earth filling, gsb, wbm-2, wbm-3, pot holes repair, tack coat, carpeting, seal coating, bamboo palasiding etc.(l 0.125 km)
Read moreMtc. of road from kanchanpur-machmara road to dharmankur buddha bihar, ch0.00 km to ch0.100 km(length0.100 km), under jampui hill sub-division, pwd(rnb) during the year 2025-2026/sh maintenance of earthen shoulder, rcc drain, wbm-3,tack coat, carpet
Mtc. of road from kanchanpur-machmara road to dharmankur buddha bihar, ch0.00 km to ch0.100 km(length0.100 km), under jampui hill sub-division, pwd(rnb) during the year 2025-2026/sh maintenance of earthen shoulder, rcc drain, wbm-3,tack coat, carpet
Read moreMtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)
Mtc. of kanchanpur-jalabassa road under jampui hill sub-division, pwd(rnb) during the year 2025-26 sh- construction of rcc protection wall, sal piling, laying of filter bed, back filling etc. at ch 3.90 km near santipur pump house (length 18.30 mtr)
Read morePr of dupatacherra pwd road to bhavona mandir, ch0.00 km to ch0.750 km(length0.750 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026 sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat etc.
Pr of dupatacherra pwd road to bhavona mandir, ch0.00 km to ch0.750 km(length0.750 km), under jampui hill sub-division, pwd(rnb) during the f.y. 2025-2026 sh maintenance of earthen shoulder, pcc work, wbm-3,tack coat, carpeting, seal coat etc.
Read moreMaintenance of road from damcherra to ballukcherra road at ch. 12.00 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3 etc.
Maintenance of road from damcherra to ballukcherra road at ch. 12.00 km under damcherra sub division, pwd r and b during the year 2025 2026 sh construction of retaining wall, pucca drain,gsb,wbm 3 etc.
Read moreWidening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Widening of the road from jalabasa kanchanpur dmc part from ch. 8.22 km to 9.503 km l 1.283 km under damcherra sub division pwd r and b during the year 2025 26 sh- excavation, construction of granular sub base, wbm etc.
Read moreMaintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para at ch.1.20km l s under damcherra sub division, pwd r and b during the year 2025 2026 sh patchmetalling, carpeting. seal coating,rcc retaining wall, wbm 3, pavers
Maintenance of road from damcherra khedacherra road to uttamjoy para via tabjirai para at ch.1.20km l s under damcherra sub division, pwd r and b during the year 2025 2026 sh patchmetalling, carpeting. seal coating,rcc retaining wall, wbm 3, pavers
Read moreof your Industry type