Tender Details

Particulars Details
Title
Mcb Dp 32 A C Curve With 10 Ka Breaking Capacity,Mcb Dp 40 A C Curve With 10 Ka Breaking Capacity,M
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2024/B/5340734
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date September 04, 2024 17:09
End Date
Expired 14/09/2024

Expired 716 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Goa Shipyard Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 ADITYA TRADING CORPORATION - 12-09-2024 19:59:19 MSE Qualified
2 INDUSTRIAL ASSOCIATES - 12-09-2024 19:26:08 N/A Qualified
3 M/S SHUBH ELECTRICALS - 14-09-2024 11:34:34 N/A Qualified
4 SANLEC AUTOMATION - 12-09-2024 13:51:56 MSE Qualified
5 SAVVY ELECTRICALS - 14-09-2024 11:52:02 MSE Qualified
6 SK Enterprise - 12-09-2024 17:22:15 MSE Qualified
Similar Tenders
E-tender for supply of 10 kl capacity of water tanker with sprinkler for subbarayanahalli and timmappangudi iron ore mines, sandur, bellary dist of ksmcl, bangalore, karnataka

E-tender for supply of 10 kl capacity of water tanker with sprinkler for subbarayanahalli and timmappangudi iron ore mines, sandur, bellary dist of ksmcl, bangalore, karnataka

Read more
Development, operation and maintenance including civil works, installation of smart technology solutions, and collection of gate entrance fees from goods and goods vehicles at k.r. market in bccc for a period of 10 (ten) years, with a minimum yearly payment of 36.50 lakhs (excluding gst) and other taxes to bccc.

Development, operation and maintenance including civil works, installation of smart technology solutions, and collection of gate entrance fees from goods and goods vehicles at k.r. market in bccc for a period of 10 (ten) years, with a minimum yearly payment of 36.50 lakhs (excluding gst) and other taxes to bccc.

Read more
Group- a anatomy digital metaphase slide scanner system co2 incubator microprocessor-controlled class ii a2 type bio-safety cabinet cyclomixture weighing machine (electronic analytical and precision balances) water bath fully automated autoclave large centrifuge machine mini centrifuge machine laboratory refrigerator (cold cabinet) (4 to 10 degree c) -20 (minus twenty) degree c freezer microvolume spectrophotometer gel documentation system digital vortex mixer gradient pcr machine

Group- a anatomy digital metaphase slide scanner system co2 incubator microprocessor-controlled class ii a2 type bio-safety cabinet cyclomixture weighing machine (electronic analytical and precision balances) water bath fully automated autoclave large centrifuge machine mini centrifuge machine laboratory refrigerator (cold cabinet) (4 to 10 degree c) -20 (minus twenty) degree c freezer microvolume spectrophotometer gel documentation system digital vortex mixer gradient pcr machine single channel electronic pipettes ph meter slide warning plate

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.

Read more
Mcb dp 20a ,breaking capacity 10 ka, b series

For complete deion and other details, please refer to tender

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise