Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Vertical Submersible Pump, 20 M3/Hr,Vertical Submersible Pump, 10 M3/Hr,Mandatory Spares,Supervision
|
| Description |
|
| Organisation | NA | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5504180 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 15, 2024 16:12 |
| End Date |
Expired
25/10/2024
Expired 717 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana
Read moreVertical glandless centrifugal pump having capacity 10m3/hr as per technical specification,vertical
Read more
Complete absorber agitator assembly,supervision,mandatory spares 1,mandatory spares 2,mandatory spa
Read more
Complete absorber agitator assembly,supervision,mandatory spares 1,mandatory spares 2,mandatory spa
Read more
Supply-150 m3 per hr loading pump-gandhinagar,supply-mandatory spares-gandhinagar,supervision of in
Read more
of your Industry type