Tender Details

Particulars Details
Title
Complete Repairing And Rewinding Of One No. 150 Kva 3.3 Kv / 440 Volt, One No. 100 Kva, 3.3 Kv/440 V, One No. 40 Kva, 3.3 Kv/440 Volt And Two No. 10 Kva, 3.3 Kv/220 V Distribution Transformer And Lighting Transformers Of Different Location Of Kocp Unde
Description
Complete Repairing And Rewinding Of One No. 150 Kva 3.3 Kv / 440 Volt, One No. 100 Kva, 3.3 Kv/440 V, One No. 40 Kva, 3.3 Kv/440 Volt And Two No. 10 Kva, 3.3 Kv/220 V Distribution Transformer And Lighting Transformers Of Different Location Of Kocp Unde
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_329966_1
Reference
Number
PO/KOCP/EnM/Tender/24 25/20
Tender Fee 0
EMD 3700
Tender Value
Place KOCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342031
Start Date February 24, 2025 19:30
End Date

06/03/2025 ( Expired 93 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Complete rewinding of 500kva 3.3 kv/440v 3phase lighting transformer eef make sl. no. 400985 at chp colony, at dhansar ocp, adic

Complete rewinding of 500kva 3.3 kv/440v 3phase lighting transformer eef make sl. no. 400985 at chp colony, at dhansar ocp, adic

Read more
Complete repairing and rewinding of 250 kva, 11 kv/440v, marson make, sl no. 26433 distribution transformer and 10 kva, 3.3 kv/230v, k-sambhav powertronics make, sl no. ks/10/22/28 lighting transformer of tnocp under hazaribagh area.

Complete repairing and rewinding of 250 kva, 11 kv/440v, marson make, sl no. 26433 distribution transformer and 10 kva, 3.3 kv/230v, k-sambhav powertronics make, sl no. ks/10/22/28 lighting transformer of tnocp under hazaribagh area.

Read more
Complete repairing / rewinding of 500 kva lighting transformer 3.3 kv / 415 volt, s/n 2800022343, 46/656 amp, make aeg/ngef installed at rest house substation of sawang washery.

Complete repairing / rewinding of 500 kva lighting transformer 3.3 kv / 415 volt, s/n 2800022343, 46/656 amp, make aeg/ngef installed at rest house substation of sawang washery.

Read more
Repairing / rewinding of 300 kva, 11 kv/440v power transformer oil cooled type, make abhay transformer and switch gear, sl. no. 1866 of intake well at bhojudih coal washery.

Repairing / rewinding of 300 kva, 11 kv/440v power transformer oil cooled type, make abhay transformer and switch gear, sl. no. 1866 of intake well at bhojudih coal washery.

Read more
Repairing of 3.3kv/440 volt distribution transformer installed at different location in mines and colony in respect of rohini project, nk area

Repairing of 3.3kv/440 volt distribution transformer installed at different location in mines and colony in respect of rohini project, nk area

Read more
Repairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s

Repairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s

Read more
Repairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.

Repairing/rewinding of 02 no. 150 kw, squirrel cage induction motor with volt 3.3 kv make toshiba rpm 1440 sr.no. 30048860m and sr.no. 30048861m installed at 2104 secondary and 2101 primary crusher under chp/cpp,ppr.

Read more
Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera

Erection of 3.3kv o/h line from 10 no substation to cocp excavated patch for power supply to pump and installation of 100 kva, 3.3kv/440v lighting transformer along with erection of 440volt o/h line for lighting at cocp pumping station of sarubera

Read more
Work of complete repairing, rewinding and installation of 01 no. of 500 kva 11 kv 440 volts transformer make kirloskar sl. no. 81id 141566 at karmik nagar sub station, bccl, hq.

Work of complete repairing, rewinding and installation of 01 no. of 500 kva 11 kv 440 volts transformer make kirloskar sl. no. 81id 141566 at karmik nagar sub station, bccl, hq.

Read more
Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad

Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad